HPSW Regeneration 14/15 Dock; Survey, Design and Delivery
A Addendum Notice
by KBS MARITIME LTD
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 20 Aug 2024
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
1 buyer
- KBS Maritime Portsmouth
Description
This project relates to the High Pressure Salt Water (HPSW) fire suppression system at 14 and 15 dock. A new HPSW system is required for vessels in wet dock and dry dock for fire suppression while maintenance work is ongoing. The initial phase of this project is survey & design, the contract may extend to build however this will be determined once the solution is established. Please note the information in this notice relates to whole project if build is included. The aim of the initial phase is to survey and determine all the unknown variables and to produce a detailed design of a permanent solution for vessel fire suppression. Scope of the works may also include removal of any existing redundant systems required to install the new system, ground and engineering works required enable the system to be used as intended.
Ammendments to Previous Notice
2. IV.2.2
Thu Fri Aug 22 30 12:00:00 2024
CPV Codes
- 45248000 - Construction work for hydro-mechanical structures
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0486e0
- FTS 026533-2024