Contract 91 - Dynamic Purchasing System for Consultancy 2025-2027
A Tender Notice
by NORTH TYNESIDE COUNCIL
- Source
- Find a Tender
- Type
- Contract (Services)
- Duration
- 4 year
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 01 Oct 2024
- Delivery
- To 06 Nov 2028 (est.)
- Deadline
- 06 Nov 2024 00:00
Concepts
Location
North Tyneside
2 buyers
- North Tyneside Council North Tyneside
Description
The Authority is establishing a DYNAMIC PURCHASING SYSTEM (DPS) for the supply of Consultancy Services for Construction (Contract 91 - Dynamic Purchasing System for Consultancy 2025-2027) The DPS has an initial duration of 2 years with options to extend for up to a further 2 x 12 months at the sole discretion of the Authority and is anticipated to commence Jan 2025. Stage 1 - Compliance checking application stage and this does not any pricing. Interested suppliers simply complete the Questionnaire (application form) along with providing ALL the evidence as stated in the documents. Stage 2 - 'Mini Competition' stage, is the request for pricing stage which when a need is identified in a Lot a request is issued to all suppliers successful to the relevant Lot via the NEPO Portal to submit a quote. Full details are provided in the DPS documentation which is divided into the following Lots which are very high level which allows any work under the Title/ basic description to be issued as mini competition in that Lot. Further information can be found in the documents,although the information is very high level. Accreditation(s) where required, are pass or fail at the sole discretion of the Authority, are listed below each Lot Lot 1 – Heritage & Conservation Architecture - RIBA Conservation Architect, RIBA Specialist Conservation Architect or AABC Architect Accredited in Building Conservation Lot 2 – Tree Survey - ISA – International Society of Arboriculture Lot 3 – Energy Assessment - BREEAM certified / CIBSE – Chartered Institute of Building Services Engineers Lot 4 – Landscape Design - Chartered Member of the Landscape Institute Lot 5 – Topographical / Measured Survey / Utility Survey - PUMA and / or Chartered Institution of Civil Engineering Surveyors Lot 6 – Ecology Survey & Biodiversity Net Gain (BNG) - CIEEM – Chartered Institute of Ecology and Environmental Management Lot 7 – Geo Environmental / Site Investigation / CMRA - CEng – Chartered Engineer / ICE – Institute of Civil Engineers, ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers Lot 8 – Drone Inspection - Licensed professional Lot 9 – Lighting Assessment - SLL – Society of Light and Lighting Lot 10 – Archaeological Services - MCIfA – Member of Chartered Institute for Archaeologists Lot 11 – Utility Management - CEng – Chartered Engineer / ICE – Institute of Civil Engineers or ISE – Institute of Structural Engineers or IHE – Institute of Highways Engineers or NRSWA (contractors) Lot 12 – Noise Assessment & Acoustic Design Services - IOA – Institute of Acoustics Lot 13 – 3D visualisation Lot 14 – Damp proofing surveys - CSRT - Certified Surveyor in Remedial Treatment, CSSW - Certified Surveyor in Structural Waterproofing or CSTDB - Certificated Surveyor of Timber and Dampness in buildings Lot 15 – Fire integrity service - IFE – Institution of Fire Safety Engineers Lot 16 – Flood Risk Assessment (FRA) - CIWEM – Chartered Institute of Water and Environmental Management Lot 17 – Civil and Structural Design Services - ICE - Institute of Civil Engineers
Lot Division
1 | Heritage & Conservation Architecture The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
2 | Tree Survey The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
3 | Energy Assessment The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
4 | Landscape Design - Chartered Member of the Landscape Institute The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
5 | Topographical / Measured Survey The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
6 | Ecology Survey & Biodiversity Net Gain (BNG) - CIEEM – Chartered Institute of Ecology and Environmental Management The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
7 | Geo Environmental / Site Investigation / CMRA The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
8 | Drone Inspection The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
9 | Lighting Assessment The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
10 | Archaeological Services The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: … Further information relating to the operation of the DPS and the Authority Requirements are |
11 | Utility Management The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
12 | Noise Assessment & Acoustic Design Services The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
13 | 3D visualisation The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: Lot 13 - 3D visualisation |
14 | Damp proofing surveys The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
15 | Fire integrity service The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
16 | Flood Risk Assessment (FRA) The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
17 | Civil and Structural Design Services The DPS has an initial duration of two years with options to extend for up to a further two x twelve months at the sole discretion of the Authority and is anticipated to commence January 2025. … The DPS is divided into Lots which are very high level and the requirement will be specified by the Authority at Stage 2 ‘Mini Competition’. This Lot is: |
Renewal Options
Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework. Contract Duration The initial contract is for 24 months with two options to extend for up to a further 12 months each after which renewals will be undertaken in accordance with the Authority's contract Standing Orders and at the sole discretion of the Authority and in line with the Authority Requirements for the Framework.
CPV Codes
- 71000000 - Architectural, construction, engineering and inspection services
- 77200000 - Forestry services
- 77211600 - Tree seeding
- 73000000 - Research and development services and related consultancy services
Indicators
- Bids should cover one or more lots.
- Bids should cover the whole contract.
- This is a recurring contract.
- Options are available.
- Renewals are available.
- Award on basis of price and quality.
Other Information
Further information relating to the operation of the DPS and the Authority Requirements are available in the Tender pack which can be downloaded immediately on registering an interest in this opportunity. Interested Suppliers must access the Tender documents for further information, which are available to download immediately in the NEPO Portal after registering an interest via the link below. Unregistered Suppliers will be re-directed to a registration page, registration is free via the link provided: https://procontract.due-north.com and searching via opportunities or looking at our current Tenders via: North Tyneside Tendering Opportunities or https://my.northtyneside.gov.uk/category/606/tender-and-contract-opportunities
Reference
- FTS 031296-2024