Manchester Airport Signalling
A Tender Notice
by KIER INFRASTRUCTURE AND OVERSEAS LIMITED - CP7 NWC
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 4.5 year
- Value
- £10M-£20M
- Sector
- CONSTRUCTION
- Published
- 05 Nov 2024
- Delivery
- 10 Mar 2025 to 01 Oct 2029
- Deadline
- 13 Nov 2024 17:00
Concepts
Location
1 buyer
- Kier Infrastructure & Overseas Clippers Quay
Description
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. Kier are seeking expressions of interest for the Design, Installation, Testing and Commisoning of the signalling requirements for the remodelling of Manchester Airport. This opportunity requires lineside signalling design, SSI Interlocking & Data Design and Westlock/WestCAD updates to MROC. Kier require a D&B price for the full scope of works. It is anticipated that the supplier may require to sub-consult/sub-contract the works relating to the MROC WestCAD system.
CPV Codes
- 45234115 - Railway signalling works
- 71320000 - Engineering design services
Other Information
Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=87172...
Reference
- C4N87172103
- CF db1f0517-16cd-4be3-91dc-eac302b47198