AMP 8 Framework- Capital Strategic Delivery Partners (SDP)

A Utilities Contract Award Notice
by SOUTHERN WATER SERVICES LTD

Source
Find a Tender
Type
Framework (Works)
Duration
7 year (est.)
Value
£6B
Sector
CONSTRUCTION
Published
08 Nov 2024
Delivery
To 03 Oct 2031 (est.)
Deadline
n/a

Concepts

Location

Sussex, Kent, Hampshire and Isle of Wight

Geochart for 2 buyers and 5 suppliers

Description

Southern Water Services (SWS) is anticipating that AMP8 will be the largest investment programme it has ever undertaken, given its plans for WINEP and WRMP, and the service it is seeking to deliver for customers. SWS now wishes to secure a range of supply chain partners for the delivery of its AMP8 capital programme. The AMP8 regulatory period will run from April 2025 to March 2030. The current frameworks used for engineering, design and construction services have been in place for almost 10 years and expire on 31st March 2025. In procuring new frameworks, we are seeking to build on positive changes made in AMP7, but also to look beyond AMP8 and take important steps to reflect supplier feedback, moving towards excellence in all that we do. The new arrangements will offer the option of running for AMP9. In parallel to this procurement process, Southern Water is working up its plans for PR24 – including working with our regulators and stakeholders to confirm the investment that will be available, and the capital delivery projects that will need to be undertaken. The PR24 process will benefit from having the AMP8 supply chain in place to assist with ongoing planning and transition to AMP8. A collaborative framework for the delivery of strategic programmes, including; strategic planning, outline design, detailed design and build The scope of the framework is anticipated to be as follows: Services across the Client’s geographical region including Isle Of Wight (IOW). This is intended to be used for a Strategic Delivery Partner working across the Asset Lifecycle Process providing strategic planning, design, construction management services and expertise. Identify and develop options in accordance with the Client’s technical and engineering standards for all aspects of Water, Wastewater and Infrastructure systems. Achieve the required asset performance or customer outcomes by identifying: low build or no-build solutions. sustainable including low carbon, catchment, and nature-based solutions. lowest Totex or Best Value solutions across an agreed Tranche or Programme of works. how the solution(s) deliver benefit as measured through the Client’s Balanced Scorecard, and at an aggregate catchment or system level.

Lot Division

1 Capital SDP Non-Infrastructure Water

Lot 1 – Water non-infrastructure services for whole of Client’s region. The works may include but not be limited to the following: The Contractor shall provide; strategic planning, design, construction management services and expertise including: Create, manage and optimise its allocated programmes, including developing programme, tranche and project execution plans as required by the Client. Supporting the Client with pre-construction enabling activities. Undertaking construction enabling activities (e.g. site surveys, site preparation, streetworks management , including communicating with the customer). Preparing all aspects of work delivery planning, including identification of the most cost-efficient civils, mechanical and electrical, and environmental construction resource to deliver the works, for review and acceptance by the Client. Work with the Client to regularly optimise the specification and procurement of the Client’s Standard Asset List, including use of centralised or buying club solutions. Managing and undertaking construction delivery to the time, cost, quality and risk parameters agreed with the Client. Managing and undertaking commissioning and handover according to Client Engineering Standards.

2 Capital SDP Non-Infrastructure Wastewater

Lot 2 – Wastewater non-infrastructure services for whole of Client’s region. The works may include but not be limited to the following: The Contractor shall provide; strategic planning, design, construction management services and expertise including: Create, manage and optimise its allocated programmes, including developing programme, tranche and project execution plans as required by the Client. Supporting the Client with pre-construction enabling activities. Undertaking construction enabling activities (e.g. site surveys, site preparation, streetworks management , including communicating with the customer). Preparing all aspects of work delivery planning, including identification of the most cost-efficient civils, mechanical and electrical, and environmental construction resource to deliver the works, for review and acceptance by the Client. Work with the Client to regularly optimise the specification and procurement of the Client’s Standard Asset List, including use of centralised or buying club solutions. Managing and undertaking construction delivery to the time, cost, quality and risk parameters agreed with the Client. Managing and undertaking commissioning and handover according to Client Engineering Standards.

3 Capital SDP Infrastructure Water & Wastewater

Lot 3 – Water and Wastewater Infrastructure services for whole of Client’s region. The works may include but not be limited to the following: The Contractor shall provide; strategic planning, design, construction management services and expertise including: Create, manage and optimise its allocated programmes, including developing programme, tranche and project execution plans as required by the Client. Supporting the Client with pre-construction enabling activities. Undertaking construction enabling activities (e.g. site surveys, site preparation, streetworks management , including communicating with the customer). Preparing all aspects of work delivery planning, including identification of the most cost-efficient civils, mechanical and electrical, and environmental construction resource to deliver the works, for review and acceptance by the Client. Work with the Client to regularly optimise the specification and procurement of the Client’s Standard Asset List, including use of centralised or buying club solutions. Managing and undertaking construction delivery to the time, cost, quality and risk parameters agreed with the Client. Managing and undertaking commissioning and handover according to Client Engineering Standards.

Award Detail

1 Costain (London)
  • SDP Non Infra Water and Wastewater
  • Reference: 1
  • Num offers: 4
  • Value: £1,881,833,333 [share]
  • Awarded to group of suppliers.
2 MWH Treatment (Helsby)
  • SDP Non Infra Water and Wastewater
  • Reference: 1
  • Num offers: 4
  • Value: £1,881,833,333 [share]
  • Awarded to group of suppliers.
3 Kier Integrated Services (Salford)
  • SDP Non Infra Water and Wastewater
  • Reference: 2
  • Num offers: 4
  • Value: £1,881,833,333
4 Galliford Try Construction (Middlesex)
  • SDP Non Infra Wastewater
  • Reference: 3
  • Num offers: 4
  • Value: £907,333,333
5 Morrison Water Services (Stevenage)
  • SDP Infra Water & Wastewater
  • Reference: 4
  • Num offers: 3
  • Value: £1,524,000,000

Award Criteria

Technical 70.0
Commercial 30.0
PRICE 30.0

CPV Codes

  • 45200000 - Works for complete or part construction and civil engineering work
  • 45231300 - Construction work for water and sewage pipelines
  • 45232151 - Water-main refurbishment construction work
  • 45232152 - Pumping station construction work
  • 45252120 - Water-treatment plant construction work
  • 45252126 - Drinking-water treatment plant construction work
  • 71310000 - Consultative engineering and construction services
  • 71800000 - Consulting services for water-supply and waste consultancy
  • 72224000 - Project management consultancy services
  • 45232400 - Sewer construction work
  • 45252100 - Sewage-treatment plant construction work
  • 45252127 - Wastewater treatment plant construction work
  • 45252140 - Sludge-dewatering plant construction work

Indicators

  • Award on basis of price and quality.

Reference

Domains