Chesterfield Canal Trust - Main Works Contractor

A Tender Notice
by THE CHESTERFIELD CANAL TRUST LIMITED

Source
Contracts Finder
Type
Contract (Works)
Duration
16 month
Value
£3M-£4M
Sector
CONSTRUCTION
Published
21 Nov 2024
Delivery
07 Mar 2025 to 30 Jun 2026
Deadline
28 Jan 2025 13:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 The tender documents are available from Jon Lindley. His contact details are: Email: j.lindley@chesterfield-canal-trust.org.uk Mobile: 07891624755 The procurement process is set out in the ITT, but will broadly consist of a single stage submission followed by an interview. Site Visit It is highly recommended that you conduct a site visit whilst preparing your submission. The Client will be hosting a site visit on 3 or 4 December 2024. This is an opportunity for all Contractors who have confirmed their intention to bid to attend the site with the Client. Upon receipt of the ITT please advise if you wish to attend the Client hosted site visit.

CPV Codes

  • 42122130 - Water pumps
  • 45112500 - Earthmoving work
  • 45223500 - Reinforced-concrete structures
  • 45233161 - Footpath construction work
  • 45247110 - Canal construction