Purchase of a Mobile Welfare Unit for Golitha Falls NNR

A Contract Award Notice
by NATURAL ENGLAND

Source
Contracts Finder
Type
Contract (Products)
Duration
4.5 month
Value
£20K-£40K
Sector
TRANSPORT
Published
22 Nov 2024
Delivery
08 Oct 2024 to 28 Feb 2025
Deadline
07 Oct 2024 11:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

We are the East Cornwall NNRs Team of Natural England, who manage Goss Moor and Golitha Falls National Nature Reserves in Cornwall. We are seeking a Ground Hog GP360 Eco Fusion Pulse 12ft mobile welfare unit with the following specs & extras: specs & extras: • Road legal • Two years warranty • Length 3655 mmLength (including drawbar) 4920 mm • Height (on wheels) 2.9 m • Height (on ground) 2.5 m • Generator 6 kVA • Unladen Weight 1750 kg • Possible Gross Weight 1800 kg* • Solar Panel 360 Watt • Fresh Water 20 Litres • Waste Water 20 Litres • Toilet Tank Size 280 Litres • Fuel Tank Size 58 Litres • Canteen area with table and bench seating for up to 6 people • 12V LED lighting with PIR • 12V diesel powered air blown heating system • Warm water supplied by a 230V on-board heating system • Large stainless steel sink c/w warm water tap • Single inverter powered socket & USB connection • Generator start panel c/w hour run meter • Fresh & waste water containers (20 Ltr cap each) • Consumer board c/w RCD & MCBs Carbon monoxide monitor and smoke alarm • 130Amp hour battery/ charger & battery guard • Toilet area with plastic recirculating toilet • 12V LED lighting with PIR in toilet area • Forearm wash basin with c/w warm water tap in toilet area • Warm water supplied by a 230V on-board heating system • Generator/ Warm Room • 12V LED lighting with PIR in generator/ warm room • 12V diesel powered air blown heating system in generator/ warm room • Access to fuel tank with separate fuel level in generator/ warm room • gauge (58 Ltr cap) in generator/ warm room • Fuel Active system in generator/ warm room • Generator start battery in generator/ warm room • Fuel tank runtime = approx. 25 hours in generator/ warm room • Spare wheel and tyre • Corporate branding and colour scheme • Safety pack We would like the unit delivered to the Lower Penrose Veor Farm, St Dennis, St Austell, Cornwall, PL26 8DB.

Award Detail

1 Genquip (Port Talbot)
  • Value: £26,820

CPV Codes

  • 34114300 - Welfare vehicles

Indicators

  • Contract is suitable for SMEs.

Other Information

To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) attached. Your response must be sent to toby.cogan@naturalengland.org.uk by 12 midday on 07/10/2024. If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to toby.cogan@naturalengland.org.uk. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers. Golitha Welfare Unit - Order Form NE Standard Goods & Services Terms and Conditions.docx NE_Commercial Response basic.docx RFQ Welfare Unit Request for Quote.docx Golitha Welfare Unit - Order Form NE Standard Goods amp; Services Terms and Conditions (Signed_copy)_Redacted.pdf

Reference

Domains