The Centre for Veterinary Vaccine Innovation and Manufacturing (CVIM) - Design and Build
A Contract Award Notice
by THE PIRBRIGHT INSTITUTE
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 16.5 month
- Value
- £6M
- Sector
- CONSTRUCTION
- Published
- 17 Dec 2024
- Delivery
- 28 Aug 2024 to 09 Jan 2026
- Deadline
- 05 Jul 2024 11:00
Concepts
Location
1 buyer
- Pirbright Institute Woking
1 supplier
- Scitech Engineering Godalming
Description
A joint initiative between the Biotechnology and Biological Sciences Research Council (BBSRC), part of UK Research and Innovation (UKRI), the Foreign, Commonwealth and Development Office (FCDO) and the Bill & Melinda Gates Foundation will see the creation of a new centre at The Pirbright Institute designed to accelerate the development of animal vaccines to combat emerging and urgent infectious diseases. The consequences of livestock disease can be catastrophic. As well as posing a very real risk to global food security and international trade, livestock disease also presents a significant threat to global human health due to its pandemic potential. While the UK remains a world-leader in the early-stage development of vaccines for both human and veterinary medicine, globally we need to strengthen our collective capacity to translate scientific discoveries into solutions for the most challenging veterinary infectious diseases. The new Centre for Veterinary Vaccine Innovation and Manufacturing (CVIM) will bridge the gaps between research and expertise in process development and manufacturing while strengthening the UK's own emergency response capacity and capability. It will bring about tangible health and economic benefits by focusing on diseases prevalent in low- and middle-income countries. Procurement Route - Design and Build Tender Strategy - 'Open Procedure' Single Stage Tender Design Stage - Stage 3 Form of Contract - NEC4 Option A: Fixed Price with Activity Schedule The successful Contractor will be responsible for designing and building a c.590m2 new-build facility for The Pirbright Institute, c.461m2 of functional space on the ground floor and c.129m2 of plant space on the first floor. 1) General building outline: New build facility, 590m2, two story above ground, with all functions on ground floor, and plant room on the first floor, comprising of 1 nr GMP cleanroom (ISO007), 1 nr cold-room (CNC), 1 nr freezer room, RM Storage and receipt areas, 1 nr QC Micro lab (CNC), 1 nr QC lab (CNC), a write up area/office and all supporting areas including a plant room and associated external works. 2) The building will be constructed within the existing Pirbright site. 3) Achieve Part L - 2, target for Net Zero Carbon (NZC). The design of the facility will include biocontainment (ACDP CL2/SAPO2/GMO2), BREEAM: Very Good, cleanrooms (up to ISO7), good manufacturing practice (GMP), net-zero carbon and equity, diversity and inclusion (EDI). The project team have developed the RIBA stage 3 design in accordance with the end-user requirements. The project team that developed the RIBA Stage 3 design in conjunction with the end-user requirements were as follows. • Project Manager - Currie and Brown • Cost Manager - Turner and Townsend • Multi-Disciplinary Design Consultant / CMT - Scitech
Award Detail
1 | Scitech Engineering (Godalming)
|
CPV Codes
- 45214610 - Laboratory building construction work
Indicators
- Contract is suitable for SMEs.
Other Information
Please note that Appendix 1 - Confidentiality Agreement must be completed, signed, and emailed to procurement@pirbrightinnovations.co.uk asap. Then and only then will access to the full ITT package (Appendices 4 & 5) be granted to the requester. CVIM - ITT (1).docx Appendix 1 - ITT.zip Appendix 2 - Evaluation.zip Appendix 3 - Contract documents.zip Please note that Addendum to Appendix 3 - Contract documents that includes NEC4 2017 - Sample Form of Agreement R3 replaces Appendix 3 - Contract documents that includes NEC4 2017 - Sample Form of Agreement(332790303.5) (TTa) Please ensure that you review NEC4 2017 - Sample Form of Agreement R3. The main changes are listed below for convenience: - Addressing the fact that the contractor is to be responsible for the entire design, and risk. - Non selection of option X15 - No sectional completion - Defining 'beneficiaries' with regards to collateral warranties - Amending references to 'appendices' in lieu of annex's (As per our ITT folder structure) Addendum to Appendix 3 - Contract documents.zip Please note that Addendum to Appendix 3 - Contract documents that includes NEC4 2017 - Sample Form of Agreement R4 replaces Appendix 3 - Contract documents that includes NEC4 2017 - Sample Form of Agreement R3. Please ensure that you review NEC4 2017 - Sample Form of Agreement R4. Addendum to Appendix 3 - Contract documents R4.zip CVIM Main Contractor Bidders Presentation.pdf Bidders Day - Clarification Q&A Log.pdf Revised clarification log Bidders Day - Clarification Q&A Log V2.pdf Revised clarification log Bidders Day - Clarification Q&A Log V3.pdf
Reference
- CVIM/D&B/2024
- CF 41d3582a-9f85-4a92-bf31-368d36eafd91