BATTERY ENERGY STORAGE INSTALLATION (BESS) - Multiple UK & Ireland Based
A Tender Notice
by FLUENCE ENERGY UK LTD
- Source
- Contracts Finder
- Type
- Framework (Works)
- Duration
- 8 month
- Value
- £5M-£10M
- Sector
- INDUSTRIAL
- Published
- 07 Jan 2025
- Delivery
- 05 May 2025 to 07 Jan 2026
- Deadline
- 24 Jan 2025 15:11
Concepts
Location
1 buyer
- Fluence Energy London
Description
Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS). We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland). Typical BoP scope activities includes (but not limited to): Preliminaries: Project & Site Management Design & Engineering Management Electrical System Studies Site Setup Civil Works: Enabling Works Setting out and surveys HSE, site infrastructure and CDM compliance Temporary works requirements Establish Finished platform Piling Drainage works Ducting and troughing installation Installation of equipment bases Control Room Installation Equipment lifting Landscaping Electrical Works: Lightning Protection, earthing, bonding Supply & install of switchboards Supply & Install cables including terminations Supply & Install Auxiliar Transformers Supply & Install Containerised Building/Control Room/s Control & Protection Panels & Wiring Supply & Install BESS External Lighting Supply & Install BESS CCTV System (optional) Supply & Install DC Systems (Containerised Building) (Optional) Installation of Fire Alarm Panels (including wiring ) BESS - Offloading, Positioning & Installation of Battery Enclosures BESS - Cooling Liquid filling of Battery Enclosures BESS - Offloading, Positioning & Installation of Power Conversion Systems BESS - Offloading, Positioning & Installation of Core Transformers BESS - Offloading, Positioning & Installation of Core Support Enclosures BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel BESS - Supply & Installation of Cables in all Battery Nodes BESS - Supply & Installation of Communication Cables BESS - Supply & Installation of Auxiliary Power Cables BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building BESS - Supply & Installation of Auxiliary F-Stop Cables BESS - Supply & Installation of Fire Alarm System Cables Test & Commissioning: Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables) Quality Assurance Documentation
CPV Codes
- 09330000 - Solar energy
- 31600000 - Electrical equipment and apparatus
- 45200000 - Works for complete or part construction and civil engineering work
- 31121300 - Wind-energy generators
- 71311100 - Civil engineering support services
- 31422000 - Battery packs
- 43310000 - Civil engineering machinery
- 09332000 - Solar installation
- 71314000 - Energy and related services
Indicators
- Contract is suitable for SMEs.
Other Information
Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=89278...
Reference
- C4N89278941
- CF d6402396-98f4-4039-8823-d26c73ea17be