Wynn Brook Flap Valve

A Contract Award Notice
by DEFRA GROUP COMMERCIAL

Source
Contracts Finder
Type
Contract (Works)
Duration
3 month
Value
£58K
Sector
PROFESSIONAL
Published
14 Feb 2025
Delivery
03 Feb 2025 to 02 May 2025
Deadline
06 Jan 2025 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers
DEFRA Group Commercial
Jba Bentley
Leaflet | Map tiles by Stamen Design, under CC BY 3.0. Data by OpenStreetMap, under ODbL.

1 buyer

1 supplier

Description

The flap gate at Wynn Brook, Chigwell Road, Woodford Green has been disconnected from the frame. This is affecting the operational condition of the asset. Repair works are required to bring the asset to recommended operational condition The flap gate is still on site but not in place. In the current, damaged condition the flap gate is susceptible to back flow in high water level conditions from the River Roding. The objective of the works is to bring the existing asset to its intended standard of service. This will be done by reinstalling the flap gate with new bracketry and security features.

Award Detail

1 Jba Bentley (Skipton)
  • Value: £57,905

CPV Codes

  • 79415200 - Design consultancy services
  • 45000000 - Construction work

Other Information

AOMR ECSC Scope_Wynn Brook Flap Valve- Final JNB signed+EA Signed (1)_Redacted AOMR ECSC Scope_Wynn Brook Flap Valve- Final JNB signed+EA Signed (1)_Redacted.pdf