Eastern Region OHLE Minor Works Framework

A Tender Notice
by NETWORK RAIL INFRASTRUCTURE LTD

Source
Find a Tender
Type
Contract (Works)
Duration
3 year
Value
___
Sector
CONSTRUCTION
Published
05 Jan 2021
Delivery
To 04 Feb 2024 (est.)
Deadline
04 Feb 2021 00:00

Concepts

Location

London

Geochart for 2 buyers and 0 suppliers

Description

Renewal and refurbishment work of Overhead lines and associated equipment including associated OHLE design works, renewing and refurbishing wire runs, insulators, droppers, booster transformers, bonding, earthing, OHLE structure repairs, and other associated OHLE equipment. Please note that you are registered in the Railway Industry Supplier Qualification Scheme (RISQS) portal with the following RICCL codes to Express an Interest. The codes are: F.C.1.1: Main Steelwork / Install F.C.1.1: Main Steelwork / Modify F.C.1.2: Small Part Steelwork / Install F.C.1.2: Small Part Steelwork / Modify F.C.1.4: Support System / Install F.C.1.4: Support System / Modify F.C.1.5: Wiring / Install F.C.1.5: Wiring / Modify F.C.1.6: Earthing Bonding / Install F.C.1.6: Earthing Bonding / Modify F.C.1.7: Switching / Install F.C.1.7: Switching / Modify

Lot Division

2 South Lot - OHLE Minor Works Framework
2

Renewal Options

24

CPV Codes

  • 45000000 - Construction work
  • 50220000 - Repair, maintenance and associated services related to railways and other equipment

Indicators

  • Restrictions apply to the lot award allocation.
  • Bids should cover one or more lots.
  • Bids should cover the whole contract.
  • This is a recurring contract.
  • Renewals are available.
  • Award on basis of price and quality.

Other Information

Under the CDM regulations, the Contractor will be required to act as Principal Contractor. Any Contractor who wishes to submit a bid will be required to obtain a Network Rail Principal Contractors License (PCL). Network Rail will sponsor any Contractors who wish to bid for the works a provisional PCL. The Contractor will be required to maintain the PCL throughout the lifespan of the Framework.

Reference

Domains