DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME
A Tender Notice
by DEPARTMENT FOR INFRASTRUCTURE RIVERS
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 1 year
- Value
- 6M
- Sector
- CONSTRUCTION
- Published
- 08 Jan 2021
- Delivery
- To 01 Apr 2022 (est.)
- Deadline
- 01 Apr 2021 14:00
Concepts
Location
Upstream and downstream.. from New Bridge on the Bryansford Road, Newcastle, County Down
2 buyers
- Department for Infrastructure Rivers Cookstown
Description
The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.
CPV Codes
- 45200000 - Works for complete or part construction and civil engineering work
- 45240000 - Construction work for water projects
- 45262211 - Pile driving
Indicators
- Bids should cover the whole contract.
- Renewals are not available.
- Performance considerations apply.
- Professional qualifications are sought.
- Staff qualifications are relevant.
- Award on basis of price and quality.
Other Information
CPD, in its capacity as a central purchasing body, is managing this procurement procedure on behalf of the contracting authority which... is The Department for Infrastructure. The Contracting Authority expressly reserves the right to award one, some, all. or no Lots; . ii. not to.. award any contract/framework agreement as a result of the procurement process commenced by publication of. this notice or to cancel.. the procurement at any stage; and. iii. to make whatever changes it may see fit to the content and structure of the. tendering competition.. and in no circumstances will the Authority be liable for any costs incurred by Economic Operators or Candidates.. Any expenditure, work.. or effort undertaken prior to contract award is accordingly at the sole risk of the Economic Operator or Candidate. participating in this.. procurement process. No business whatsoever is guaranteed under any resulting framework agreement or contract. indeed there is no.. guarantee that any framework agreement or contract will be put in place in relation to this notice. No compensation. etc will be paid if a.. contract or framework agreement is withdrawn for any reason. Economic Operators should take part in this process. only on the basis.. that they fully understand and accept this position
Reference
- FTS 000335-2021