DFI 3233014 – SHIMNA FLOOD ALLEVIATION SCHEME

A Contract Addendum Notice
by DEPARTMENT FOR INFRASTRUCTURE RIVERS

Source
Find a Tender
Type
Contract (Works)
Duration
1 year (est.)
Value
___
Sector
CONSTRUCTION
Published
18 Jan 2021
Delivery
To 01 Apr 2022 (est.)
Deadline
n/a

Concepts

Location

Cookstown

Geochart for 1 buyers and 0 suppliers

Description

The project is for the provision of Shimna Flood Alleviation Scheme. The Economic Operator Team (EOT) will complete the construction of a fluvial flood defence in Newcastle, with an envisaged construction period of 12 months. The flood defence extends both upstream and downstream from New Bridge on the Bryansford Road and is approximately a total length of 1.45km comprising a combination of sheet pile flood walls (approx. 0.45km), secant pile flood walls (approx 0.89km) and piled earth embankments (approx. 0.11km). The EOT will be responsible for the final detailed design of the secant piles and sheet piles. Additionally, the works include the demolition of a number of property boundary walls and fences, the Relocation of a drainage ditch, construction of new pathways, wall cladding, a retaining wall, back drainage, landscaping, the erection of a flood gate and River works to MEMORANDUM OF INFORMATION PART B The EOT will also be responsible for Landowner and Stakeholder consultations ensuring necessary permissions, licences, permits, consents and approvals.

Ammendments to Previous Notice

2. IV.2.2) Time limit for receipt of projects or requests to participate

2021-04-01 2021-02-22 15:00

CPV Codes

  • 45200000 - Works for complete or part construction and civil engineering work

Reference

Domains