AMP7/AMP8 Capital Programmes Geographic Lots for Infrastructure and Non-Infrastructure Projects
A Utilities Contract Award Notice
by THAMES WATER UTILITIES LTD
- Source
- OJEU
- Type
- Framework (Works)
- Duration
- 10 year (est.)
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 19 Feb 2021
- Delivery
- To 19 Feb 2031 (est.)
- Deadline
- n/a
Concepts
Location
Reading
2 buyers
- Thames Water Utilities Reading
7 suppliers
- Barhale Hertfordshire
- Galliford Try Construction London
- Interserve Construction Birmingham
- J Murphy London
- Morrison Utility Services Stevenage
- Mott Macdonald Bentley Skipton
- MWH Treatment Salford
Description
TWUL are procuring design and build delivery capability for Infrastructure and non-Infrastructure projects. Essentially, TWUL recognises these as infrastructure – nominally the underground network of water mains and sewage and non-infrastructure – nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water’s water and wastewater infrastructure (network) and non-infrastructure (treatment) assets across the Thames Water region. The nature of the infrastructure scope broadly extends from rehabilitation, replacement and provision of new sewers and potable water pipelines to inspection and maintenance of aqueducts and tunnels. This will also include refurbishment, replacement and provision of new pumping station assets. Non-infrastructure scope includes refurbishment, replacement and provision of new potable water and wastewater treatment assets including service and storage reservoirs.
Lot Division
2 | Non-Infrastructure — London The water non infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, — disinfection, — surge protection, — chemical dosing, — supervisory control and data acquisition (SCADA), — run-to-waste facilities, — cartridge filters and UV, — increased power resilience, — new service reservoirs. — inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new treatment facilities such as inlet works, — stormwater storage, — event duration monitors, — settlement tanks, — biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), — digester roof replacement, — combined heat and power (CHP), — chemical dosing, — phosphorous removal, — odour control, — SCADA, — increased power resilience. |
3 | Non-Infrastructure — London The water non infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, — disinfection, — surge protection, — chemical dosing, — supervisory control and data acquisition (SCADA), — run-to-waste facilities, — cartridge filters and UV, — increased power resilience, — new service reservoirs. — inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new treatment facilities such as inlet works, — stormwater storage, — event duration monitors, — settlement tanks, — biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), — digester roof replacement, — combined heat and power (CHP), — chemical dosing, — phosphorous removal, — odour control, — SCADA, — increased power resilience. |
3 | Non-Infrastructure — London The water non infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, — disinfection, — surge protection, — chemical dosing, — supervisory control and data acquisition (SCADA), — run-to-waste facilities, — cartridge filters and UV, — increased power resilience, — new service reservoirs. — inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new treatment facilities such as inlet works, — stormwater storage, — event duration monitors, — settlement tanks, — biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), — digester roof replacement, — combined heat and power (CHP), — chemical dosing, — phosphorous removal, — odour control, — SCADA, — increased power resilience. |
4 | Non-Infrastructure — London The water non infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, — disinfection, — surge protection, — chemical dosing, — supervisory control and data acquisition (SCADA), — run-to-waste facilities, — cartridge filters and UV, — increased power resilience, — new service reservoirs. — inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new treatment facilities such as inlet works, — stormwater storage, — event duration monitors, — settlement tanks, — biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), — digester roof replacement, — combined heat and power (CHP), — chemical dosing, — phosphorous removal, — odour control, — SCADA, — increased power resilience. |
5 | Non-Infrastructure — London The water non infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, — disinfection, — surge protection, — chemical dosing, — supervisory control and data acquisition (SCADA), — run-to-waste facilities, — cartridge filters and UV, — increased power resilience, — new service reservoirs. — inspection and maintenance of existing service and storage reservoirs. The Wastewater non-infrastructure scope includes but is not limited to: — refurbishment, replacement and provision of new treatment facilities such as inlet works, — stormwater storage, — event duration monitors, — settlement tanks, — biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), — digester roof replacement, — combined heat and power (CHP), — chemical dosing, — phosphorous removal, — odour control, — SCADA, — increased power resilience. |
Award Detail
1 | Barhale (Hertfordshire)
|
2 | Galliford Try Construction (London)
|
3 | Interserve Construction (Birmingham)
|
4 | J Murphy (London)
|
5 | Morrison Utility Services (Stevenage)
|
6 | Mott Macdonald Bentley (Skipton)
|
7 | MWH Treatment (Salford)
|
CPV Codes
- 45240000 - Construction work for water projects
- 90420000 - Sewage treatment services
- 45232151 - Water-main refurbishment construction work
- 45232421 - Sewage treatment works
- 45232422 - Sludge-treatment works
- 45232423 - Sewage pumping stations construction work
- 45232430 - Water-treatment work
- 45232431 - Wastewater pumping station
- 45232440 - Construction work for sewage pipes
- 45232451 - Drainage and surface works
- 45232453 - Drains construction work
Indicators
- Options are available.
- Award on basis of price and quality.
Other Information
It is proposed that these framework agreements will run for an initial period of approximately 5 years, with the option to extend on an annual basis for a maximum further 5 years. TWUL does not propose to amend the scope of works across each of the lots as it moves from AMP7 to AMP8. TWUL reserves the right to extend individual lots within this framework agreement, where operational benefits exist for doing so. TWUL proposes that any extension will apply to all elements of the contract, including but not limited to price review mechanisms (subject to any approved variations). Note that your client may be Thames Water Utilities Ltd or another company within the Kemble Water group structure.
Reference
- OJEU 089003-2021