National Museums Liverpool Infrastructure Works at Walker Art Gallery & Midland Railway Building

A Contract Award Notice
by NATIONAL MUSEUMS LIVERPOOL

Source
Contracts Finder
Type
Contract (Works)
Duration
7 month
Value
£4M
Sector
CONSTRUCTION
Published
29 Apr 2021
Delivery
08 Feb 2021 to 03 Sep 2021
Deadline
14 Dec 2020 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Bidders are asked to submit a formal tender for the Infrastructure Works Package at the Walker Art Gallery and Midland Railway Building. The works to the two buildings are to be carried out under one contract, with the works to the Walker Art Gallery forming one section of the contract and works to the Midland Railway Building forming another section. The nature of the works are as follows: Walker Art Gallery The Walker Art Gallery is a Grade II* Listed Building located in the William Brown Street Conservation Area. The proposed infrastructure works comprise: Externally, the brief includes repairs to the existing fabric following the findings of the condition report to ensure the building remains in a good state of repair. The proposals also include the replacement and changes to the roof coverings and configuration above Gallery Rooms 01-04 and A-C to manage the discharge of rainwater away from the building better, increase the lifespan of the roof coverings, reduce the maintenance requirement and improve accessibility for future inspections. Internally, the proposals aspire to improve the aesthetic appearance and spatial qualities of the galleries to enhance the historic environment, visitor experience and the display of the exhibitions. Significant internal changes include the removal of the modern flat ceiling within Gallery Room 01 and 02 to reveal the historic decorative plaster ceiling. To provide an appreciation of the lay-lights and roof lights within gallery rooms 01, 02 & 03, a significant element in the historical development of the building, and the installation of architectural lighting to improve their presentation. Midland Railway Building

Award Detail

1 Krol Corlett Construction (None)
  • Value: £3,835,844

CPV Codes

  • 45000000 - Construction work

Indicators

  • Contract is suitable for SMEs.

Other Information

The National Conservation Centre, formerly the Midland Railway Building, is a Grade II Listed Building located on Victoria Street in Liverpool. Bidders are asked to submit a formal tender for the Infrastructure Works Package at the Midland Railway Building. The proposed infrastructure works comprise: Upgrades to the mechanical and electrical installations. Further information will be issued during the tender period to detail the scope and constraints/phasing of these works. Tender Document WAG & MRB ITT - 09-11-20.pdf Appendix 1 - NML Supplemental Conditions Appendix 1 - NML Supplemental Conditions.pdf Appendix 2 - NML Safety Guidelines for Contractors Appendix 2 - NML Safety Guidelines for Contractors.pdf Appendix 3 - NML H&S Questionnaire Appendix 3 - NML H&S Questionnaire.pdf Appendix 4 - NML Procurement Protocol Appendix 4 - NML Procurement Protocol.pdf Appendix 5 - Suitability Questionnaire Appendix 5 - Suitability Questionnaire.docx 1. Appendix 6 - Work Schedule 1. Appendix 6 - Work Schedule.zip 3. Work Schedule - App D - Architects Drawings 2 of 3 3. Work Schedule - App D - Architects Drawings 2 of 3.zip 4. Work Schedule - App D - Architects Drawings 3 of 3 4. Work Schedule - App D - Architects Drawings 3 of 3.zip 5. Work Schedule - App E - M&E Drawings 1 of 4 5. Work Schedule - App E - M&E Drawings 1 of 4.zip 6. Work Schedule - App E - M&E Drawings 2 of 4 6. Work Schedule - App E - M&E Drawings 2 of 4.zip 7. Work Schedule - App E - M&E Drawings 3 of 4 7. Work Schedule - App E - M&E Drawings 3 of 4.zip 8. Work Schedule - App E - M&E Drawings 4 of 4 8. Work Schedule - App E - M&E Drawings 4 of 4.zip 9. Work Schedule - App F - Structural Engineers Drawings 9. Work Schedule - App F - Structural Engineers Drawings.zip 10. Work Schedule - App G - PCI - WAG 10. Work Schedule - App G - PCI - WAG.zip 11. Work Schedule - App L - Sika Spec (WAG) 1 of 2 11. Work Schedule - App L - Sika Spec (WAG) 1 of 2.zip 12. Work Schedule - App L - Sika Spec (WAG) 2 of 2 12. Work Schedule - App L - Sika Spec (WAG) 2 of 2.zip 2. Work Schedule - App D - Architects Drawings 1 of 3 2. Work Schedule - App D - Architects Drawings 1 of 3.zip Tender Addendum Nr 1 Tender Addendum Nr 1.pdf Appendix A - Document Schedule (Rev A) Appendix A - Document Schedule (Rev A).pdf Drawings TA Nr1 (1 of 2).zip Drawings 2 of 2 TA Nr1 (2 of 2).zip Tender Addendum Nr 2 Tender Addendum Nr 2.pdf Appendix A - Drawing Schedule (Rev B) Appendix A - Drawing Schedule (Rev B).pdf Schedule Nr 3 - SoW Midland Railway Building Schedule Nr 3 - SoW Midland Railway Building.xlsx M&E Specification TA Nr 2.zip Appendix 4 - NML Procurement Protocol Appendix 4 - NML Procurement Protocol.docx WAG & MRB ITT (Revision A - 26-11-20) WAG & MRB ITT (Revision A - 26-11-20).pdf Q&As NML Infrastructure Works Walker & Midland Tender Questions.docx