Ventilation Adaptations, CO2 Monitoring, and Heat Recovery Works

A Contract Award Notice
by TRANSPORT FOR GREATER MANCHESTER

Source
Contracts Finder
Type
Contract (Notspecified)
Duration
2.5 month
Value
£30K
Sector
CONSTRUCTION
Published
25 May 2021
Delivery
12 Apr 2021 to 30 Jun 2021
Deadline
02 Apr 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Ventilation Adaptations, CO2 Monitoring, and Heat Recovery Works at 2 Piccadilly Place. The works include the following activities: - Install CO2, temperature, and humidity sensors on all floors (2 per floor). - Supply and install new galvanised ductwork link from exhaust to supply AHU. - Supply and install new damper actuators and additional wiring as required. - Thermal insulate ductwork. - Commission Ventilation and set minimum fresh air. - Commission controls. - All required BMS controls and configuration interfacing including pre and after back-up programme to be provided to TfGM. - Supply an as installed /as built health and safety file both hard and electronic copies. - TfGM Staff training at 2 Piccadilly Place.

Award Detail

1 J Fletcher Engineers (Manchester)
  • Value: £30,000

CPV Codes

  • 45000000 - Construction work

Indicators

  • Contract is suitable for SMEs.

Reference

Domains