Air temp & relative humidity sensors

A Tender Notice
by UNIVERSITY OF SALFORD(THE)

Source
Contracts Finder
Type
Contract (Products)
Duration
1 year
Value
£5K-£8K
Sector
INDUSTRIAL
Published
12 Jul 2021
Delivery
01 Aug 2021 to 31 Jul 2022
Deadline
26 Jul 2021 12:00

Concepts

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Energy House 2 (EH2) is a large-scale building physics test laboratory to be built at the University of Salford, Manchester. The project Is part funded by the ERDF. The construction will begin in summer 2020 with the construction period set to last 12 months. The project builds on the successful Energy House project :(https://www.salford.ac.uk/built-environment/laboratories-and-studios/energyhouse ). A video of the project can be found here https://www.youtube.com/watch?v=oP3bsXeQKYU EH2 will be a unique facility and one of most advanced building test facilities on the planet. It has the following features: • 2 large chambers capable of having 2 family homes built in each one (4 homes in total) • Temperature controlled to within 0.5 °C from -20°C to +40 °C • Wind, rain, solar radiation and snow can be generated • These conditions provide testing facilities for housing covering 95% of the global population. The Energy House 2 Project has a requirement to measure RH&T in a chamber environment. These sensors will form part of a sensor network over 300 sensors. These will report back into a database using the SDI12 standard.

CPV Codes

  • 35125100 - Sensors

Indicators

  • Contract is suitable for SMEs.

Other Information

Please go to our InTend portal for full tender documentation: https://in-tendhost.co.uk/salford/aspx/Home Please send all correspondence to our InTend portal: https://in-tendhost.co.uk/salford/aspx/Home

Reference

Domains