The Supply of High Voltage Assets
A Utilities Contract Award Notice
by THAMES WATER UTILITIES LIMITED
- Source
- OJEU
- Type
- Framework (Supply)
- Duration
- 8 year (est.)
- Value
- ___
- Sector
- INDUSTRIAL
- Published
- 01 Sep 2021
- Delivery
- To 01 Sep 2029 (est.)
- Deadline
- n/a
Concepts
Location
Whole of Thames Water Region
2 buyers
- Thames Water Utilities Reading
6 suppliers
- Hawker Siddeley Switchgear Birmingham
- Siemens Camberley
- Lucy Electric Oxfordshire
- Winder Power Pudsey
- SSE Contracting Reading
- UK Power Networks Services Commercial London
Description
Thames Water Utilities Ltd (TWUL) is intending to award a number of framework agreements for the supply of high voltage (up to 36kV) switchgear, motor starters, transformers, associated ancillary equipment and related design and installation services. These goods and services will be used on our operational water and wastewater sites. TWUL has approximately 150 high voltage sites varying in size from a single transformer up to large and relatively complex distribution systems with generators and/or motor drives with the majority of the latter being located in and around the London area.
Lot Division
3 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1B includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 31.5kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. # - Maximum Short Circuit Withstand Ik for 3 sec |
4 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1B includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 31.5kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. # - Maximum Short Circuit Withstand Ik for 3 sec |
5 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1B includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 31.5kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. # - Maximum Short Circuit Withstand Ik for 3 sec |
6 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1B includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 31.5kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. # - Maximum Short Circuit Withstand Ik for 3 sec |
5 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1A includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 25kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. This lot will be awarded to a sole supplier. # - Maximum Short Circuit Withstand Ik for 3 sec |
6 | Indoor Switchgear up to 25kA for 3 sec# The scope of work for lot 1B includes: the design, provision of drawings (including contractor’s drawings), manufacture, at-works testing, supply, delivery, provision of associated documentation, on-site testing and commissioning of high voltage indoor panel type switchgear up to 36kV (up to 31.5kA for 3 sec#) including any associated protection, auxiliary relays, tripping and closing batteries and chargers. The assemblies must be fully compliant with the relevant British and international standards and the relevant Energy Networks Association Technical Specifications (ENATS). The switchgear shall also have received distribution network operator (DNO) approval or will have received DNO approval prior to contract signing. The scope of work may also include the installation of the assembly on site, if this service is required for a particular project. # - Maximum Short Circuit Withstand Ik for 3 sec |
Award Detail
1 | Hawker Siddeley Switchgear (Birmingham)
|
2 | Siemens (Camberley)
|
3 | Lucy Electric (Oxfordshire)
|
4 | Winder Power (Pudsey)
|
5 | SSE Contracting (Reading)
|
6 | UK Power Networks Services Commercial (London)
|
Renewal Options
Any agreement awarded would be for an initial duration of 3 years, with options to extend annually up to a maximum overall term of 8 years
CPV Codes
- 31200000 - Electricity distribution and control apparatus
- 31211110 - Control panels
- 45315400 - High voltage installation work
- 31214000 - Switchgear
Indicators
- Options are available.
- Award on basis of price and quality.
Other Information
**NB - THIS NOTICE IS TO NOTIFIY CONTRACT AWARD. LOT 3 WAS NOT AWARDED. All suppliers who wish to respond to this notice must request a pre-qualification questionnaire (PQQ) by using the link in Section I.3 of this notice, i.e. https://www.thameswater.co.uk/procurement. Note that your client may be Thames Water Utilities Limited or another company within the Kemble Water group structure.
Reference
- OJEU 443310-2021