Greenwich Power Station - Replacement Gas Turbine
A Pre-Procurement Notice
by TRANSPORT FOR LONDON
- Source
- Contracts Finder
- Type
- Future Contract ()
- Duration
- 1 year
- Value
- £8M
- Sector
- INDUSTRIAL
- Published
- 01 Sep 2021
- Delivery
- 01 May 2022 to 30 Apr 2023
- Deadline
- 01 Dec 2021 23:59
Concepts
Location
Geochart for 1 buyers and 0 suppliers
1 buyer
- Transport for London London
Description
1) Dismantle, removal and disposal of the complete GT/A2 asset including gas turbine, power turbine, alternator and all associated plant/equipment. 2) The design, supply, installation and commissioning of a dual-fuel capable (natural gas and liquid gas oil) open cycle gas turbine package rated to deliver nominal 14MW of power, to fit into the available footprint following the removal of the GT/A2 asset. (approximate space available 22.6m x 7.58m = 171m²).
CPV Codes
- 42112000 - Turbine installations
- 42112300 - Gas turbines
Reference
- TFL001-DN562829-42782245
- CF a1154d9e-7ea7-479c-911d-46dbee10cbb7