Design and Build of a new Leicester Maintenance Delivery Unit (MDU)

A Prior Information Notice
by NETWORK RAIL INFRASTRUCTURE LIMITED (NR)

Source
Find a Tender
Type
Contract (Works)
Duration
not specified
Value
£0-£6M
Sector
CONSTRUCTION
Published
04 Nov 2021
Delivery
not specified
Deadline
n/a

Concepts

Location

United Kingdom: Leicester/Leicestershire area

Geochart for 1 buyers and 0 suppliers

Description

NR requires a new MDU facility in the Leicester area, meeting its detailed requirements (as set out in VI.3 of this notice). These requirements include the provision of land, as well as design and build of the new MDU. NR has already carried out an extensive search of sites in the area and has identified only one suitable site.

Total Quantity or Scope

See II.1.4) Short description above

CPV Codes

  • 45000000 - Construction work
  • 45100000 - Site preparation work
  • 45111213 - Site-clearance work
  • 45200000 - Works for complete or part construction and civil engineering work
  • 45210000 - Building construction work
  • 70122000 - Land sale or purchase services

Other Information

That site is located in Fleckney and NR has engaged in provisional discussions with the relevant interest-holder in that site concerning an agreement under a land purchase and subsequent design and build contract for the provision of the MDU. This notice is being published in case any alternative sites are available, and as an opportunity for interested persons (able to contribute the land and deliver the MDU) to raise interest. To enable NR to proceed efficiently to deliver the new MDU, interested persons should contact NR (at the email address stated at I.1 of this notice) no later than 4th December 2021. ** PREVIEW NOTICE, please check Find a Tender for full details. ** This notice is not a call for competition, and NR will determine the appropriate procurement route having considered the responses (if any) to this notice. The publication of this notice does not constitute any level of confirmation or commitment by NR as to whether or not (or how) it will procure the provision of the required new MDU. The estimated date of publication of contract notice in II.3 is therefore entirely provisional and completed only because it is a mandatory field for this notice, and is not a commitment by NR to publish a contract notice or to otherwise advertise, or run, any competitive procurement process. NR welcomes responses to this notice from interested persons provided that those persons are able to deliver a new MDU in compliance with the requirements set out below and contribute the land on which the MDU will be built. Please note that provision of a suitable site is a central element of NR's requirements. While NR appreciates that persons may be interested in performing the design and / or building the new MDU, this will not meet NR's requirements unless that person is also able to bring forward a site in a suitable location. Any response should provide details of how NR's requirements would be met. NR's requirements are: - Provision of a new Leicester MDU. Premises to be used as the base for planning and implementing the maintenance of the operational railway in an area stretching from Loughborough to Wellingborough. - Supply of a site and then design to meet the accommodation requirements detailed below, planning and construction under terms to be agreed with NR (which could include a forward-funding structure) - The preferred location is within 2 miles of Leicester station as this enables quick response times to get to key rail infrastructure in the station area that may need maintaining. It also widens the choice of transport to the MDU by rail users. If not feasible then the next preference is a site located approximately mid-way between Loughborough and Wellingborough (due to the operational area to be covered by the new MDU, which extends between those two locations) but as close to Leicester station as feasible due to the reasons above. - The A6 road provides the main artery for road access to the Midland Main Line rail network south of Leicester station. Therefore, a site that has a good road connection to the A6 is preferred as this will reduce response times for getting to the rail network for maintenance works. - The new MDU is to be completed and open for use in early 2023 - Building of approx. 800 sq.m to house 32 desks, meeting rooms, break out areas, meeting rooms, workshop space , lockers and messing/kitchen facilities for c110 staff (M/F), showers, drying rooms, gym, drawing room and archive store. - Stores building and associated racking – c350 sq.m - Open storage area of 700 sq.m. and 100 sq.m of secure external storage - Parking for 85 cars, 20 vans and 1 lorry. - BREEAM status of very good