Atkins Par Highway Dam MIOS Design PSC C Contract

A Contract Award Notice
by DEFRA NETWORK ETENDERING PORTAL

Source
Contracts Finder
Type
Contract (Services)
Duration
9 month
Value
£121K
Sector
CONSTRUCTION
Published
16 Nov 2021
Delivery
15 Nov 2021 to 16 Aug 2022
Deadline
12 Nov 2021 12:00

Concepts

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

Design contract to undertake the Measures in the Interest of Safety following the Section 10 reservoir safety inspection at Par Highway Dam. The preferred solution is to discontinue the reservoir. This is to be undertaken by removing the outlet structure and re-profiling the embankment on the alignment of the Treffry Canal. The design shall include flood alleviation works to Highway Garage immediately downstream of Highway dam and an upgrade to the penstocks on Treesmill Dam outlet structure.

Award Detail

1 Atkins (Epsom)
  • Value: £120,830

CPV Codes

  • 71300000 - Engineering services

Indicators

  • Contract is suitable for SMEs.

Other Information

The form of contract is NEC4 PSC and the Terms and Conditions can be obtained from info@neccontract.com. n/a Atkins_Par_H_Dam_Design_PSC_C_contract_Redacted.pdf

Reference

Domains