Description
Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's largest stations while all the others, over 2,500, are currently managed by the country’s train operating companies. NR are undertaking a Decarbonisation/ Energy Efficiency Programme across a range of built assets in all Regions. We have already completed over 150 energy audits so far and identified significant potential to reduce carbon and energy use. NR aim to set up a framework that can be used for undertaking ‘common interventions’ that have been identified to help NR meet its energy efficiency targets. This will include the design, installation, and commissioning of the energy efficiency interventions identified by NR. The objective is to award to one supplier per lot per region. The five Network Rail regions are Eastern, Northwest & Central, Scotland's Railway, Southern and Wales & Western. List of the LOTS Upgrade to BEMS Upgrade Heating and Cooling Systems Lighting Upgrade Air Handling Units Upgrade Building Fabric Renewable Energy Generation Water efficiency measures Utility Meter Installation
Lot Division
1 | Upgrade to BEMS (Building Energy Management System)
Upgrade BEMS Infrastructure Upgrade Controls Software Standardise Schedules/ Set Points Connect plant into BEMS Upgrade main incoming and sub-metering, export data to BEMS (Gas, Electric, Heat, Cooling, and water) |
2 | Upgrade Heating and Cooling Systems
Migrate Variable Speed Drives (VSD) from fixed speed to variable Upgrade Low Temperature Hot Water (LTHW) and/or Chilled Water (CHW) systems to be variable speed demand driven Install insulation to pipework and other plant Refurbish Heating and Cooling Systems Upgrade Boilers Upgrade Heat Rejection (Chillers, DX Split Units, VRF, etc) Upgrade heating systems to Heat Pump Heat Generation (Air Source Heat Pumps (ASHPs) or Ground Source Heat Pumps) Review opportunities for heat recovery from existing cooling demands. Delivery of periodical maintenance to H&C systems Deliver BAU maintenance of heating and cooling systems to maintain energy efficient performance Delivery of forced air-cooling systems to appropriate assets |
3 | Lighting
Remove existing lighting and replace with integrated control LEDs Lighting Controls Assess existing lighting control and introduce/ upgrade lighting control system. Design, supply, install, test, and commission suitable equipment, cabling and other infrastructure |
4 | Upgrade Air Handling Units
Assess existing provision of AHUs. Propose rationalisation of AHU systems so that they run as a compatible integrated system controlled and monitored by the BEMS. Design, install, test and commission suitable equipment, cabling ductwork and other infrastructure Delivery of periodical maintenance to AHU systems |
5 | Upgrade Building Fabric
Install or upgrade insulation to the building fabric Remove windows and replace with double/ multiple glazing |
6 | Renewable Energy Generation
Install Photovoltaic (PV) Array (with / without battery) via capital or lease arrangements Design, supply, install, test and commission suitable equipment, cabling, batteries, and other infrastructure required to provide an integrated and functioning PV System The PV system can also consider ground mounted solar that includes car park canopies as well as roof structures. Install Solar Thermal Array Via capital or lease arrangements Review existing Domestic Hot Water (DHW) demand and assess feasibility and viability of solar thermal generation. Design, supply, install, test and commission suitable equipment, piping, cabling, batteries, and other infrastructure required to provide an integrated and functioning Solar Thermal System Solar PV System Maintenance |
7 | Water efficiency measures
Upgrade/ Install urinal controls Install and maintain rain/grey water harvesting |
8 | Utility Meter Installation
Install and commission AMRs and Sub-meter ensuring connection and data flow to NR systems |
CPV Codes
- 71314000 - Energy and related services
- 31500000 - Lighting equipment and electric lamps
- 09330000 - Solar energy
- 38551000 - Energy meters
Indicators
- This is a one-off contract (no recurrence)
- Options are available.
- Renewals are not available.
- Professional qualifications are sought.
Legal Justification
The contract is let under UCR 2016
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-030d1a
- FTS 001665-2022