Hydrogen-Fuelled Combustor Retrofit and Fuel Handling System (2 Lots)

A Tender Notice
by THE UNIVERSITY OF SHEFFIELD

Source
OJEU
Type
Contract (Supply)
Duration
1 day
Value
£220K
Sector
INDUSTRIAL
Published
19 Apr 2022
Delivery
01 Aug 2022 to 02 Aug 2022
Deadline
20 May 2022 12:00

Concepts

Location

Translational Energy Research Centre (TERC), Sheffield Business Park, Europa Avenue, Sheffield

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

With co-funding from the European Regional Development Fund, the University of Sheffield has established a flagship Translational Energy Research Centre (TERC) – a national multi-technology, integrated platform for research, development and innovation at pilot-scale, to understand and demonstrate green energy solutions for a sustainable, affordable and secure energy system. It is one of the largest and best-equipped research and development facilities in Europe for zero-carbon energy, hydrogen, bioenergy, combustion and carbon capture with storage/utilisation. TERC is looking to further expand its current capabilities and equipment portfolio in this area. We are therefore looking to procure two lots: LOT 1: Retrofitting a hydrogen-fired combustor for conversion of a gas turbine LOT 2: Fuel handling and mixing skid, with feeding system

Lot Division

1 Retrofitting a hydrogen-fired combustor for conversion of a gas turbine
  • Value: £154K

Lot 1: Retrofitting a hydrogen-fired combustor for conversion of a gas turbine • design and build of the hydrogen-fired burner • retro-fitting of the combustor and integration into the existing AE-T100 mGT • incorporation of temperature monitoring • modifications to the fuel system • modifications to the software and control system for the new burner and fuel block • any changes to the compressor and turbine maps, as necessary • modifications to the fuel control system (to accommodate Lot 2) – including the fuel compressor and skid controls/monitoring

2 Fuel handling and mixing skid with feeding system
  • Value: £66K

Lot 2: Fuel handling and mixing skid with feeding system • design and build of the gas mixing skid, including fuel handling and delivery system • full mechanical and electrical installation, including: rerouting the natural gas from the AE-T100 fuel compressor to the skid hydrogen connection with the site supply connect the skid outlet to the AE-T100 fuel system connect the skid controls/PLC to the AE-T100 system connect the power from the AE-T100 or the site DB

CPV Codes

  • 42110000 - Turbines and motors
  • 38000000 - Laboratory, optical and precision equipments (excl. glasses)
  • 42900000 - Miscellaneous general and special-purpose machinery

Indicators

  • Bids should cover one or more lots.
  • Bids should cover the whole contract.
  • Renewals are not available.
  • Award on basis of price and quality.

Reference

Domains