FEW1153 - Development Agreement Plot 3a-c Exploration Drive, Leicester
A Contract Award Notice
by LEICESTER CITY COUNCIL
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- £14M
- Sector
- CONSTRUCTION
- Published
- 22 Jul 2022
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Leicestershire, Rutland and Northamptonshire:
1 buyer
- Leicester City Council Leicester
1 supplier
Description
The Dock 3 scheme will deliver approx. 6,000sq.m of commercial space. This space will be approx. 4,000sq.m of offices in 2 buildings and 2,000sq.m of industrial space in a terrace of 9 units. The accommodation will be delivered on a turnkey basis and will be net carbon zero operationally
Total Quantity or Scope
The accommodation will be delivered on a turnkey basis and will be net carbon zero operationally.
Award Detail
1 | Brackley Property Developments (Rugby)
|
Award Criteria
cost | 100 |
CPV Codes
- 45000000 - Construction work
- 71000000 - Architectural, construction, engineering and inspection services
Legal Justification
The supplier has the benefit of an option over part of the site. The option gives them a contractual right to acquire the land and bring forward its redevelopment. To carry out the further development of Dock 3 – this is based on the way in which the site is being developed such that the proposed terrace of office units’ straddle both the existing site and the land the subject of the option. The supplier was commissioned to carry out design, enabling and other works to the whole site. To appoint a developer following the completion of those works would thereby incur a time delay, in understanding the site. It is likely the buildings on site will be heated by a series of ground source heat pumps. This sort of technical approach will only work on a site-wide basis. Surface water drainage to serve the site, also requires a site-wide approach. Finally, there are other practical issues in having two developers working on the same site. We understand that it in particular the developers would need to agree on how and when levels would be tied up and how and when they would work adjacent to each other on a tight site. Dock 2 was built out with the compound on the adjacent site which is the subject site here. There is no adjacent land left. If one developer develops the site, they are going to need to move a compound around. If there are two developers, it will be very difficult to have two compounds moving around a 3-acre site during a tight development programme.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0354a6
- FTS 019966-2022