TCF Traffic Free Routes and Throop Nature Park
A Contract Award Notice
by BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 14 month
- Value
- £3M
- Sector
- CONSTRUCTION
- Published
- 03 Nov 2022
- Delivery
- 01 Nov 2022 to 31 Dec 2023
- Deadline
- 05 Aug 2022 13:00
Concepts
Location
1 buyer
- Bournemouth Christchurch & Poole Council Bournemouth
1 supplier
- R&W Civil Engineering New Forest
Description
The Works comprise:\r C2-6\r • Construction of a combined pedestrian cycle bridge with a clear span of 33m over the River Stour with 1 in 20 gradient approach ramps\r • 1.7km of 3m wide surfaced path connecting new bridge crossing to Christchurch Road\r • New toucan crossing to be installed over Christchurch Road; and\r • Widening of 250m of existing shared path on northern side of Christchurch Road\r \r Throop Nature Park\r • 1.1km of new paths, a combination of shared paths and footpaths\r • New informal 20 space car park with EV charge points and associated new access from Taylor Drive\r • Uncontrolled pedestrian crossing to Taylor Drive and carriageway markings\r • New fencing and gates\r • Entrance and wayfinding signage installation\r • Street furniture installation - cycle stands, seats, dog bins, bollards, height barrier
Award Detail
1 | R&W Civil Engineering (None)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.
Other Information
Further Competition via Hampshire County Council (HCC) Generation 4 Lot 2 (GEN4-2)
Reference
- BOURN001-DN619204-96129613
- CF 4927b8cf-9fa4-4a23-b80a-4d04a11d3337