Continuous River Monitoring
A Prior Information Notice
by UNITED UTILITIES WATER LIMITED
- Source
- Find a Tender
- Type
- Contract (Services)
- Duration
- not specified
- Value
- ___
- Sector
- INDUSTRIAL
- Published
- 17 Nov 2022
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
North West England:
1 buyer
- United Utilities Water Warrington
Description
Water companies have a duty under Section 82 of the Enviroment Act to protect the environment from the effects of discharges from storm overflows and wastewater treatment works. Water companies are required to monitor the quality of water potentially affected by, upstream and downstream, discharges from these assets. This requires the monitoring of the following perameters: (a) levels of dissolved oxygen, (b) temperature and pH values, (c) turbidity, (d) levels of ammonia, and (e) anything else specified in regulations made by the Secretary of State. These measuremnts will typically be made in rivers and/or a local measurement kiosk and we would request evidence for the equipment operating in such an environment both during routine operation and under exceptional conditions such as storms. 3rd party validation of sensor monitoring technology would be of interest at this stage.
Total Quantity or Scope
The application also requires the functionality to achieve the following: - Continuously monitor and log data (every 15 minutes) - Provide a telemetry interface and a public facing portal which can display values in near real time and provide reporting capabilities Unitied Utilities operate approximately 2300 Combined Sewer Overflows and 575 Waste Water Treatment works which are impacted by this new requirement. Unitied Utilities are looking for indicative costs, per installation, based on the following procurement routes: - Supply of instrumentation - Design, build and instalation of instrumentation sampling kiosks - Service and maintenance of the above - Provision, management and administration of telemetry and a web based portal for the above Instrumentation and the monitoring arrangement shall be suitable for monitoring the required parameters in an appropriate range for the application. Solutions may be based on multi-parameter sondes, wet chemistry analysers or a combination of both. We require 2 installation solutions: For PR24 planning pumped kiosk-based systems should be used. In-situ suitcase systems should be the option where it is known that a pumped kiosk installation is infeasible and will remain infeasible in future. Need to understand: Proposed solutions Costs Interest to provide or ability to provide all elements associated Risks Volume supply capacity per month/year Accuracy/Uncertainty Repeatability Maintenance intervals We require interested parties to work with Defra and regulators to establish an accredited quality system for the calibration and maintenance of real time continuous water quality monitors. Further detail on governance and assurance requirements is expected in the technical guidance and implementing legislation. For PR24 planning a need to comply with an industry-wide accreditation process (such as MCERTS) should be accounted for which will likely require product certification prior to use. Additional information: Please look through all of the documentation attached to this competition. All information should be available on EU Supply including all attachments.
CPV Codes
- 71700000 - Monitoring and control services
- 32441200 - Telemetry and control equipment
- 38810000 - Industrial process control equipment
- 45315300 - Electricity supply installations
- 50000000 - Repair and maintenance services
- 50410000 - Repair and maintenance services of measuring, testing and checking apparatus
- 51100000 - Installation services of electrical and mechanical equipment
- 51210000 - Installation services of measuring equipment
- 51230000 - Installation services of testing equipment
- 51900000 - Installation services of guidance and control systems
- 90733100 - Surface water pollution monitoring or control services
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** Please read all attachments to this opportunity and respond to the questions within the United Utilities Continuous River Monitoring PIN Questions document. This can be in any form required.
Reference
- ocds-h6vhtk-03860f
- FTS 032621-2022