Design, Supply & Installation of a Flue Glass Cleaning Abatement System
A Tender Notice
by GLASS FUTURES
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- 9 month
- Value
- £0-£1M
- Sector
- INDUSTRIAL
- Published
- 31 Jan 2023
- Delivery
- To 27 Nov 2023 (est.)
- Deadline
- 02 Mar 2023 10:00
Concepts
Location
East Merseyside:
1 buyer
- Glass Futures Sheffield
Description
Design, Supply, Install and Commission a Flue Glass Cleaning Abatement System at the GFL site in St Helens, Northwest England
Total Quantity or Scope
GFL is looking to appoint a single contractor to Design, Supply, Install and Commission a Flue Glass Cleaning Abatement System for their Centre of Excellence in St Helens, Northwest England including but not limited to the following: Full Mechanical installation and commissioning of all equipment and individual components. Design and supply for the complete fabrication of the FGC package and ductwork from the connection point from the furnace and including all systems leading up to and the Stack. The provision of calculations relating to the expansion of all ducting and pipework. Full Electrical Installation and commissioning of all equipment and individual components. Electrical supplies and control cabling as required to all equipment. All Mechanical and Electrical containment supports and fixings. GFL requires a price for both standard instrumentation/components and separately ATEX rated instrumentation/components. The provision and installation of all associated valves, pressure regulators and fittings. Instrumentation and Process Control hardware that is compatible with our Distributed Control System (DCS). Full package of drawings and technical documents relating to all applicable areas and components of the FGC package. The design installation and layout should give consideration all foreseeable maintenance requirements and procedures. All calculations relating to the operation and the performance of the Flue Gas Cleaning system should be produced by the contractor and part of the design scope. Provision and contribution to any required safety surveys from project conception through to completion i.e. HAZID, HAZOP & HAZCON. Provision and execution of all FAT / SAT requirements to all applicable areas and components of the FGC package. Provision and execution of all commission requirements i.e. Cold & Hot Provide a separate cost for a 5-year service and maintenance package Additional information: The procurement is related to a project financed by UK Government funds via UKRI Grant Funding Agreement
Renewal Options
Options will be included in the procurement documents and are associated with the specification and inclusion of equipment based upon technical solution and price
Award Criteria
Quality | 55 |
price | 45 |
CPV Codes
- 42000000 - Industrial machinery
- 45262610 - Industrial chimneys
- 38433200 - Emission measurement equipment
- 42514000 - Machinery and apparatus for filtering or purifying gases
- 90711500 - Environmental monitoring other than for construction
Indicators
- This is a one-off contract (no recurrence)
- Options are available.
- Renewals are not available.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at https://www.mytenders.co.uk/Search/Search_Switch.aspx?ID=228578. The Buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.mytenders.co.uk/sitehelp/help_guides.aspx Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic responses well in advance of the closing time to avoid any last minute problems. (MT Ref:228578) NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at https://www.mytenders.co.uk/Search/Search_Switch.aspx?ID=228578. The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.mytenders.co.uk/sitehelp/help_guides.aspx. Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems. (MT Ref:228578)
Reference
- ocds-h6vhtk-03a18f
- FTS 002971-2023