Aids to Navigation Support Vessel Replacement
A Contract Award Notice
by NORTHERN LIGHTHOUSE BOARD
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- not specified
- Value
- £52M
- Sector
- TRANSPORT
- Published
- 12 May 2023
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
Scotland: SCOTLAND
1 buyer
- Northern Lighthouse Board Edinburgh
1 supplier
- Astilleros Gondan Asturias
Description
The vessel shall be built as a DP Buoy laying/servicing vessel capable of carrying out: Buoy Work Inspection of navigation aids and wreck finding in UK and Irish Waters Lighthouse Inspections Emergency towing operations
Total Quantity or Scope
The vessel shall be able to incorporate an ROV and AUV launching and recovery unit with associated equipment containers. The materials for - construction of and components for the vessel shall be selected according to best shipbuilding practices for an expected lifetime of the vessel being not less than 25 years and to meet the highest environmental standards. The sailing profile shows operations from a few hours up to 30 days at sea where sea conditions frequently become very rough. The vessel and its equipment, tank capacities etc. shall be designed for this sailing profile, with focus on safety and best possible sea keeping performance. The vessel shall be designed, constructed and supervised by a European and IACS recognised classification society in accordance with their rules and regulations for the classification of ships in force at the date of signing the contract between the Buyer and Builder, including corrigenda and amendments as included in notices or similar. The notion shall correspond with Lloyds Register as follows 100A1, LA, *IWS, ECO LMC, UMS, Hybrid Power (+), NAV1, IBS, DP(AA), CAC2 Descriptive note: Buoy and Light tender, ShipRight ABN (SQ), ShipRight (MCBM), ShipRight CYBER, and ShipRight UWM-L (T10), UWN-L (Q5) Characteristics of the New vessel as detailed below: Length Overall (LOA) Max 70.00m Breadth, mid, max 16.00m Breadth extreme max 16.30m Air draught at design draught max 27.00m Draught (design) 3.40m @14 days endurance Draught (max design) 3.90m @30 days endurance Draught (scantling) 3.95m Frame spacing 0.60m Full Service Speed 14 knots Light Weight 1900 tonnes approx Transit speed 10.5 knots in rough weather up to sea state 6 (5 metres sig wave height) Eco speed (normal transit) 10.5 knots Wco speed (survey work with auto pilot) 5 knots Bollard pull based on revered engineering estimated 60 tonnes
Award Detail
1 | Astilleros Gondan (Asturias)
|
2 | Astilleros Gondan (Asturias)
|
Award Criteria
Design Development | 5 |
Project Management Team | 10 |
Project Management Process | 10 |
Delivery Programme | 10 |
Resources | 10 |
Makers List | pass/fail |
Design | pass/fail |
Supply chain Management | 10 |
Major Sub contracts | pass/fail |
Steel | pass/fail |
Carbon Reduction Plan | 5 |
Social Values | 10 |
Contract Price | 22.5 |
Plan and Evidence of Funding | 7.5 |
Guarantees | pass/fail |
Insurances | pass/fail |
CPV Codes
- 34500000 - Ships and boats
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** To view this notice, please click here: <a href="https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=780945618" target="_blank">https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=780945618 GO Reference: GO-2023512-PRO-22958647
Reference
- ocds-h6vhtk-02b2d8
- FTS 013639-2023