PRO004736-Works-Framework-Build Only
A Tender Notice
by UNITED UTILITIES WATER LIMITED
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 10 year
- Value
- £6B
- Sector
- CONSTRUCTION
- Published
- 29 Aug 2023
- Delivery
- To 03 Aug 2033 (est.)
- Deadline
- 25 Sep 2023 11:00
Concepts
Location
North West England:
1 buyer
- United Utilities Water Warrington
Description
United Utilities' 5 year asset management plans for the AMP8 period (and AMP9) has adopted a delivery model formed of 5 distinct delivery runways. This procurement is for the Build Only delivery runway. The scope of works will be for construction of assets in the following 2 Lots: Lot 1 - Non-Infrastructure Lot 2 - Infrastructure In total up to 17 framework agreements will be awarded, 7 for Lot 1, and 10 for Lot 2 respectively. Projects will be awarded via NEC4 based call-off contracts. The number of projects awarded will be subject to AMP8 requirements and dependent on the size, type and geography of the final agreed programme for AMP8, and beyond.
Lot Division
1 | Non-Infrastructure
Lot 1 Non-Infrastructure: Water Treatment, Waste Water Treatment, Pumping Stations & Storage, Reservoirs, Bio Resources and Energy. Work types that we envisage will form part of the Lot 1 Non-Infrastructure works (non-exhaustive) include: • Sludge treatment Bio-digesters • Chemical Dosing Rigs • Primary, secondary & tertiary wastewater treatment process • Gas Holders • MEICA Installation and commissioning • Presses • Combined Heat and Power • Access Roads and Site Facilities • Other construction works. |
2 | Infrastructure
Lot 2 Infrastructure: Water Networks & Water Network Pipelines, Wastewater Networks & Wastewater Network Pipelines, Pumping Stations & Storage and Reservoirs. Work types that we envisage will form part of the Lot 2 Infrastructure works (non-exhaustive) include: • Pump Installations • Concrete in-situ tank installations • Pre-fabricated tanks • CSO chamber installations & pump return • Sewer upsizing and installations • Screen installations • MEICA Installation and commissioning • Access Roads and Site Facilities • Other construction works. |
Renewal Options
United Utilities shall have the option to extend for one or more further periods of up to 5 years in total, up to a longstop date of 31 March 2035.
CPV Codes
- 45000000 - Construction work
- 45200000 - Works for complete or part construction and civil engineering work
- 45210000 - Building construction work
- 45220000 - Engineering works and construction works
- 45221200 - Construction work for tunnels, shafts and subways
- 45231000 - Construction work for pipelines, communication and power lines
- 45231300 - Construction work for water and sewage pipelines
- 45240000 - Construction work for water projects
- 45247000 - Construction work for dams, canals, irrigation channels and aqueducts
- 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
- 45252120 - Water-treatment plant construction work
- 71000000 - Architectural, construction, engineering and inspection services
- 71248000 - Supervision of project and documentation
- 71300000 - Engineering services
- 71541000 - Construction project management services
- 90712400 - Natural resources management or conservation strategy planning services
- 71310000 - Consultative engineering and construction services
Indicators
- Restrictions apply to the lot award allocation.
- This is a one-off contract (no recurrence)
- Options are available.
- Renewals are not available.
- Professional qualifications are sought.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-036534
- FTS 025376-2023