PRO004751-Works-Framework-Minor Works
A Utilities Contract Notice
by UNITED UTILITIES WATER LIMITED
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- 11 year
- Value
- £800M
- Sector
- CONSTRUCTION
- Published
- 09 Feb 2024
- Delivery
- To 09 Jan 2035 (est.)
- Deadline
- 11 Mar 2024 12:00
Concepts
Location
Warrington
2 buyers
- United Utilities Water Warrington
Description
United Utilities (UU) 5 year asset management plans for the AMP8 period (and AMP9) has adopted a delivery model formed of 5 distinct delivery runways. The scope of this procurement is for the Build-Only delivery runway and this is the Minor Works element of that runway. This procurement is split into 2 Lots. The scope of works will be construction of assets in the following 2 categories: Lot 1 - Civils Construction (20 awards) Lot 2 - Mechanical & Electrical Installation (10 awards) In total up to 30 framework agreements will be awarded. Projects will be awarded via NEC4 based call-off contracts. The number of projects awarded will be subject to AMP8 requirements and dependent on the size, type and geography of the final agreed programme for AMP8, and beyond.
Lot Division
1 | Civils Construction
Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s Work types that we envisage will form part of the Lot 1 Civils Construction works include: Sludge treatment digesters and tanks Chemical Dosing Rigs Primary, secondary & tertiary wastewater treatment process Gas systems CSO chamber installations & pump return Sewer/Large Diameter Trunk Mains upsizing and installations Buried pipework Demolition Fish Passages Pre-fabricated tanks Concrete in-situ tank installations Media Changes Boreholes Access Roads and Site Facilities Other construction works |
2 | Mechanical & Electrical Installation
Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s Work types that we envisage will form part of the Lot 2 Mechanical & Electrical Installation works include: Sludge treatment, digestion, handling and pumping CHP Engines Chemical Dosing Rigs Pumps and pumping systems Primary, secondary & tertiary wastewater treatment process Instrumentation and alarms Safety Instrumented Systems Above-ground pipework Valves and actuators Pressure vessels and boilers Heat exchangers Gas systems including storage, consumers, pipework and ancillaries Equipment and protective systems for use in explosive atmospheres CSO chamber installations & pump return Screen & weir installations MEICA Installation and commissioning Other M&E Installation works. |
Renewal Options
United Utilities shall have the option to extend beyond the initial term of 6 years for one or more further periods of up to 5 years in total, up to a longstop date of 31 March 2035.
CPV Codes
- 45000000 - Construction work
- 45200000 - Works for complete or part construction and civil engineering work
- 45221200 - Construction work for tunnels, shafts and subways
- 45231300 - Construction work for water and sewage pipelines
- 45240000 - Construction work for water projects
- 45247000 - Construction work for dams, canals, irrigation channels and aqueducts
- 45252000 - Construction works for sewage treatment plants, purification plants and refuse incineration plants
- 71248000 - Supervision of project and documentation
- 45220000 - Engineering works and construction works
Indicators
- Restrictions apply to the lot award allocation.
- Bids should cover one or more lots.
- Bids should cover the whole contract.
- Options are available.
- Renewals are not available.
- Professional qualifications are sought.
- Award on basis of price and quality.
Reference
- FTS 004344-2024