Design and Build of Abbey Fields Swimming Pool
A Modification Notice
by WARWICK DISTRICT COUNCIL
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 3 year
- Value
- £27M-£39M
- Sector
- CONSTRUCTION
- Published
- 14 May 2024
- Delivery
- To 20 May 2027 (est.)
- Deadline
- n/a
Concepts
Location
Kenilworth, Warwickshire
2 buyers
- Warwick District Council Leamington Spa
1 supplier
- Kier Construction Manchester
Description
A 2 stage mini competition was undertaken through the NHS Construction framework. A single supplier was selected through stage 1, and we have now awarded to that supplier following stage 2 of price finalisation. To facilitate contract management and the staggering of the work across 2 sites, the contract has been split into 2 physical contracts. This notice is the second, and last, of these contracts for Abbey Fields following it being signed on 6th September 2022.
Ammendments to Previous Notice
2. Contract value
GBP 26,843,427 39,393,427
Award Detail
1 | Kier Construction (Manchester)
|
CPV Codes
- 45210000 - Building construction work
- 45220000 - Engineering works and construction works
- 45300000 - Building installation work
- 45400000 - Building completion work
Indicators
- Contract modified due to unforeseen circumstances.
Legal Justification
Although the potential for historic remains was identified at the site, the extent of these remains was assumed to be low due to the existing Abbey Fields swimming pool. However, following demolition of the swimming pool and more detailed ground investigations, an extensive amount of historic remains were identified on site. These then had to be carefully excavated and assessed prior to being carefully recovered. This discovery caused massive delays in the start of the project after the main contractor has already begun on site and resulted in compensation events being raised by the contractor to cover the delay. In addition, the resulting historical remains required a changed in design specification for the ground works needed to support the new building. These design changes resulted in additional costs as well as the appointment of additional specialist sub contractors.
Reference
- FTS 015323-2024