Re-roofing and associated works at the Sutton Bonington Campus - AWARD
A Contract Award Notice
by THE UNIVERSITY OF NOTTINGHAM
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 0.5 year
- Value
- £679K
- Sector
- INDUSTRIAL
- Published
- 30 May 2024
- Delivery
- 01 Jul 2024 to 31 Dec 2024
- Deadline
- 06 May 2024 07:53
Concepts
Location
1 buyer
- Nottingham University Nottinghamshire
1 supplier
- Allsopp Construction Swadlincote
Description
The UoN is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015. Synopsis: Primary contractor required to carry out Roof Renewal Works at the South Labs and The Boiler House Buildings including: o Remove all existing waterproofing, insulation, and any Air & Vapour Control Layers from all perimeter upstands and detailing to abutment upstands and vertical skirtings. o Blisters / Detached bitumen membrane: Repair, re-adhere and protect with additional layer of matching bitumen membrane if necessary. o All new materials and accessories: Must be compatible with existing. Some brands & materials to be specified o Renewing roof as specified including: Preliminary work including formation of abutment upstands, kerbs, box gutters, sumps, grooves, chases and expansion joints. o Fixing of battens, fillets and anchoring plugs/strips as required. o Thorough Priming o Applying new underlayer, capping sheets, upstands and detailing in line with the specification.
Award Detail
1 | Allsopp Construction (Swadlincote)
|
CPV Codes
- 45300000 - Building installation work
Reference
- IT-55-1466-2113/FC08/LH - AWARD
- CF 2aeb8a53-3ae8-4137-9fb3-691c6c033469