New Buildings for Northern Regional College, Ballymena Campus
A Voluntary Ex-Ante Transparency (VEAT) Notice
by NORTHERN REGIONAL COLLEGE
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 3 year (est.)
- Value
- £31M-£32M
- Sector
- CONSTRUCTION
- Published
- 30 May 2024
- Delivery
- To 26 Jul 2027 (est.)
- Deadline
- n/a
Concepts
Location
Existing Ballymena Site at Farm Lodge BT43 7DF
2 buyers
- Northern Regional College Ballymena
1 supplier
- Heron Bros Magherafelt
Description
The project is the development and construction of a new campus for Northern Regional College constructed on the existing Ballymena Site at Farm Lodge. The project will include the following works: site clearance including phased removal of existing college buildings and associated services and drainage; existing drainage and services diversions; earthworks including cut/fill and removal of surplus excavated/unsuitable material; phased construction of new fully serviced campus building; site works and associated landscaping. The form of contract for pre-construction period will be NEC4 Option A and for the construction period will be NEC4 Option C. The project will be delivered to BIM Level 2. The project will consist of a phased approach of demolition and construction in order to deliver the new campus. The project will be delivered within a live fully operational environment. Refer to the procurement documents for further information
Total Quantity or Scope
Refer to the procurement documents for further information.
Award Detail
1 | Heron Bros (Magherafelt)
|
CPV Codes
- 45210000 - Building construction work
Indicators
- Award on basis of price and quality.
Legal Justification
Due to circumstances which could not have been foreseen at the time of publication of the Contract Award Notice, Northern Regional College are now required to further increase the value of this contract. This is required as additional expenditure has been incurred due to the continued effect of ongoing inflationary pressures which were not anticipated at the time of the original Contract Award Notice. These factors have precipitated a more rapid consumption of the value of the contract and reflect the application of the Procurement Advisory Note (PAN 01/21). The uplift to the contract value also being sought as a precautionary measure to ensure the completion of the new campus at Ballymena by the specified completion date. A comprehensive value engineering exercise was carried out during and in an effort to mitigate against these unforeseen expenditures and inflation effects. As a result, there has been a reduction in the total building area by 800m2 with a material decrease in build cost, however, the facilities originally within the reduced building area have been reallocated elsewhere within the premises and the overall reduction in size constitutes less than 5% of the total building area. This reallocation ensures that no specialist part of the project has been omitted. Additionally, there have been changes to the specification of finishes throughout the building, including the floor finishes, and a change in the specification of the facing brick to adapt to these new circumstances accordingly. Regulation 72(1)(c) permits this extension due to unforeseen circumstances which a diligent contracting authority could not have foreseen, the overall nature of the contract is not altered and Modification value is an additional circa 9% and a reduction through value engineering of circa 6.5% neither of which in combination exceed 14.99% of the original contract value. Regulation 72(1) (b) further permits this extension as it would be economically and contractually unfeasible to switch contractor without causing significant delay and duplication of build costs. A change of provider: (i) cannot be made for economic and technical reasons as requirements of interchangeability or interoperability of services procured under the original procurement; and (ii) will cause significant inconvenience and duplication of costs.
Reference
- FTS 016855-2024