Supply of substation environmental monitoring equipment

A Contract Award Notice
by SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC

Source
Find a Tender
Type
Framework (Supply)
Duration
8 year (est.)
Value
£2M
Sector
INDUSTRIAL
Published
03 Jul 2024
Delivery
To 14 Dec 2032 (est.)
Deadline
n/a

Concepts

Location

Perth

Geochart for 2 buyers and 1 suppliers

Description

Substation design often provides large control buildings that are made of metal, and temperature swings are significant which can impact operations. Most substation sites have multiple rooms and areas which contain key Operational Technology (OT) equipment in locations separate from the OT Panel. SSEN Distribution requires environmental monitoring equipment which can produce alerts from substations to the control room, allowing environmental issues to be dealt with before incidents occur which could impact the operational technology and customer supply.

Award Detail

1 Schneider Electric (Telford)
  • FW Supply & Deliver - Environmental Monitoring Equipment - Multi 0630
  • Num offers: 1
  • Value: £1,750,000

Award Criteria

Technical 30.0
PRICE 70.0

CPV Codes

  • 31682540 - Substation equipment

Indicators

  • Award on basis of price.

Reference

Domains