Supply of substation environmental monitoring equipment
A Contract Award Notice
by SCOTTISH HYDRO ELECTRIC POWER DISTRIBUTION PLC
- Source
- Find a Tender
- Type
- Framework (Supply)
- Duration
- 8 year (est.)
- Value
- £2M
- Sector
- INDUSTRIAL
- Published
- 03 Jul 2024
- Delivery
- To 14 Dec 2032 (est.)
- Deadline
- n/a
Concepts
Location
Perth
Geochart for 2 buyers and 1 suppliers
2 buyers
1 supplier
- Schneider Electric Telford
Description
Substation design often provides large control buildings that are made of metal, and temperature swings are significant which can impact operations. Most substation sites have multiple rooms and areas which contain key Operational Technology (OT) equipment in locations separate from the OT Panel. SSEN Distribution requires environmental monitoring equipment which can produce alerts from substations to the control room, allowing environmental issues to be dealt with before incidents occur which could impact the operational technology and customer supply.
Award Detail
1 | Schneider Electric (Telford)
|
Award Criteria
Technical | 30.0 |
PRICE | 70.0 |
CPV Codes
- 31682540 - Substation equipment
Indicators
- Award on basis of price.
Reference
- FTS 020294-2024