Contract for Thameslink, Southern and Great Northern Rail Services. Currently operated by Govia Thameslink Railway Ltd
A Contract Addendum Notice
by DEPARTMENT FOR TRANSPORT
- Source
- OJEU
- Type
- Contract (Services)
- Duration
- 6 year (est.)
- Value
- ___
- Sector
- TRANSPORT
- Published
- 22 Jun 2021
- Delivery
- 19 Sep 2021 to 22 Jun 2027 (est.)
- Deadline
- n/a
Concepts
Location
London
1 buyer
- Department for Transport London
Description
Contract for provision of commuter and regional rail services on the UK conventional mainline rail system. It is envisaged the services would run between: (a) Moorgate to Stevenage via Hertford (b) Moorgate to Welwyn Garden City (c) Kings Lynn/Cambridge to London Kings Cross (d) Peterborough to London Kings Cross (e) Cambridge/Peterborough/Bedford to St Pancras and the Thameslink Core (f) Rainham/Sevenoaks/Orpington/East Grinstead/Brighton/Littlehampton/Horsham/Sutton to London Blackfriars and the Thameslink Core (g) London Victoria to Brighton including Gatwick Express branded services (h) London Victoria to Littlehampton (i) London Victoria to Eastbourne and Ore (j) London Victoria to Southampton / Portsmouth / Bognor Regis (k) Brighton to Lewes/Seaford/Eastbourne (l) Eastbourne to Ore/Ashford International (m) Brighton to Southampton/Portsmouth/Bognor Regis/Littlehampton (n) Littlehampton to Bognor Regis/Portsmouth (o) London Victoria to East Grinstead (p) London Bridge to Uckfield (q) London Victoria to Reigate (r) Redhill to Tonbridge (s) East Croydon to Milton Keynes via Kensington Olympia (t) London Bridge to Caterham and Tattenham Corner (u) London Bridge to Epsom (v) London Bridge to Beckenham Junction via Peckham Rye (w) London Bridge to Victoria via Gipsy Hill (x) London Victoria to Epsom, Dorking and Horsham (y) London Victoria to Epsom Downs via Carshalton Beeches (z) London Victoria to West Croydon via Gipsy Hill There is a mixture of leisure, business and commuter travel. These services would be similar to those currently operated on the Thameslink, Southern and Great Northern Franchise.
Ammendments to Previous Notice
2. VI.1) Additional information:
The PIN published in the OJEU (document number: 534168-2020) on 2 November 2020 had envisaged that the contract start date would be 19 September 2021. This PIN is being issued as the contract start date is now envisaged to be 1 April 2022. It is anticipated that the contract will have a duration in the region of 2 to 6 years in total and this is likely to include a core period of at least 2 two years with an optional additional period or periods exercisable at the sole discretion of the contracting authority. Contract Authority. The contracting authority reserves the right not to proceed with the direct award as envisaged or to use an alternative method to procure an operator for the contract. Without limiting that, it is currently anticipated that the grant of any direct award as envisaged in this notice will follow on from the completion of certain expiry arrangements in respect of the extant franchise agreement entered into by the contracting authority and Govia Thameslink Railway Ltd on 11 June 2014 (the ‘Franchise Agreement’). The Franchise Agreement has been substantially varied by the Emergency Recovery Measures Agreement (‘ERMA’) entered into by the parties on 19 September 2020. Under the ERMA, Govia Thameslink Railway Ltd must have completed the expiry arrangements by 14 December 2020. If those arrangements are not completed by that date, the Secretary of State may terminate the ERMA. If the ERMA is terminated, the variations to the Franchise Agreement will fall away and the parties will revert to the underlying terms of the Franchise Agreement. In those circumstances, it is currently anticipated that the direct award as envisaged in this notice will not be made.
3. II.2.7) Envisaged start date and the duration of the contract
2021-09-19 2022-04-01
CPV Codes
- 60200000 - Railway transport services
- 60210000 - Public transport services by railways
Indicators
Reference
- OJEU 316827-2021