Anaysis Summary: UK – Hot Water Calorifier Water Contracts
View Tenders Refine Filters:Publication summary
Found 15 procurement notices in 2025. There are 12 unique titles.
The following chart shows the number of matched notices per month:
Buyer organisations
Supplier organisations
Top 16 suppliers
Buyer locations
Locations of the main buyers:
Keywords Sample
Below are common keywords found in published notices. Keywords derive from allocated CPV codes.
- repair and maintenance
- technical inspection and testing
- mechanical installations
- heating and plumbing equipment
- water plumbing
- boilers
- pumps, valves
- water tanks
- heating works
- water installations
- boiler installations
- technical analysis
- technical testing and analysis
- mechanical engineering
- water treatment work
- monitoring and control
- risk or hazard assessment
- disinfecting and exterminating
- plumbing consultancy
- water supply and waste
- facilities management
- water meters
- hot water boilers
- measuring apparatus
- measuring, testing and checking apparatus
- water pumps
- boiler installation
- mechanical and electrica
- quantity surveying
- lift maintenance
- construction project management
- structural engineering
Common phrases
Common phrases found within published text:
- hot water calorifier water
- 10th march
- indirect hot water calorifiers
- hot water
- hot water generators
- hot water calorifiers
- march
- heat pumps
- hot water boilers
- dhekelia station
- flue system
- boiler pumps
- air handling units
- asbestos works
- building maintenance activities
- monday 11th march
- steel pipework
- inspections• calorifier drain sample analysis
- copper pipework
- asbestos removal
Similar searches
Searches that sound similar to your query: