A Contract Award Notice
by DEFRA
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- £1
- Sector
- CONSTRUCTION
- Published
- 30 Sep 2022
- Delivery
- not specified
- Deadline
- n/a
Concepts
Location
United Kingdom:
1 buyer
- DEFRA London
26 suppliers
- Kier Construction Manchester
- Merit Holdings Northumberland
- Scitech Engineering Surrey
- Walter Lilly Leeds
- ISG Construction London
- John Sisk Hertfordshire
- Willmott Dixon Construction Hertfordshire
- GM Builders Brighton
- Morgan Sindall Construction & Infrastructure London
- ISG Engineering Services London
- Morgan Sindall Construction & Engineering London
- John Graham Construction Hillsborough
- Tilbury Douglas Construction London
- Chubb Systems Lancashire
- Galliford Try Construction Middlesex
- Openview Security Solutions Romford
- Baker Hicks London
- Ramboll London
- Tetra TECH Leeds
- WSP London
- AECOM London
- Norman Rourke Pryme London
- Rider Levett Bucknall Birmingham
- Turner & Townsend Cost Management Leeds
- Mace Consult London
- Turner & Townsend Project Management Leeds
Description
The Authority has procured Design, Build, Installation, Commissioning and Handover Services for works on the APHA Science Estate. This includes the estate at Weybridge, as well as the Regional Labs at Starcross, Camarthen, Penrith, Newcastle, Shrewsbury, Bury St Edmonds, Sutton Bonnington. The following organisations are able to use the framework: Animal and Plant Health Agency, Department for Environment Food Rural Affairs; Environment Agency, ; Marine Management Organisation; Natural England and Rural Payments Agency. The framework is broken down into seven (7) lots including, Works in Containment Facilities, General Accommodation works, Site Infrastructure Works, Security Systems, Biowaste Effluent Treatment System, Multiple Discipline Design Services and Professional Services.
Lot Division
1 | Works in containment facilities Full project life cycle including design, build, installation and refurbishments inside the containment laboratory environment. Projects will require a high standard of general design management including all design disciplines; due to the nature of the technical requirements they are likely to be MEP biased with supporting works such as builders work, air flow analysis and rectification, Building Management Systems (BMS), containment sealability assessment and rectification, provisions of appropriate fixtures and fittings etc. as required to support the MEP works. A key component of Lot 1 will be capability to design, install and commission containment laboratories and associated support facilities. Containment levels will vary from CL2, CL3 SAPO3 and SAPO4 and a combination thereof. |
2 | General Accommodation Works Full project life cycle including design, build and installation works on DEFRA sites, outside containment or in buildings that do not have containment. Projects will require a high standard of general design management including all design disciplines. Projects will comprise of carrying out surveys, minor alterations, fabric repairs, redecoration, refurbishments, and new buildings in unoccupied and occupied buildings. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. |
3 | Infrastructure Works Full project life cycle including design, build and installation works on DEFRA sites and relate to civil engineering and infrastructure works to support building projects. Projects will require a high standard of general design management including all design disciplines. Works include new geotechnical surveys, earthworks, site preparation, water, gas, telecom, electricity utilities, other below ground services, onsite roads, pavements, hard landscaping, retaining structures, foul and storm water drainage and other associated infrastructure to support developments and are typically will include the following building types. There may also be a requirement to perform demolitions, asbestos removal, enabling works, infrastructure and building clearances under this lot. |
4 | Security Full project life cycle for active security on sites and within buildings including laboratory / animal facilities, The design, installation & maintenance of active security systems including the following typical systems: • CCTV camera systems; • Perimeter intrusion detection systems; • Intrusion detection systems; • Visitor entry; • Access Control; • Security Lighting; • Security Fencing • Tracking systems • Control rooms. |
5 | Biowaste Effluent Treatment System The full project life cycle including design, build and installation of effluent treatment systems to serve the bio-containment environment. Projects will require a high standard of design management. A key component of Lot 5 will be the capability to design, install, commission and then validate the newly installed/modified equipment. Systems are expected to treat up to CL3 and SAPO4 liquid waste and integrate with the primary containment barrier. |
6 | Multiple Discipline Design Services This lot will include the provision of multiple discipline design services for construction projects including a wide range of project types such as high containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. The design disciplines include the following, however specialist design services may be requested in addition to these services: •Design Management; •Health, Safety and Environmental Design Management; •Principal Designer; •Containment / Laboratory Specialist Designer; •Security Designer; •Architecture (including Lead Designer); •Landscape Architecture; •BIM Digital Information Manager; •Building Services Engineer (including MEP); •Structural Engineering; •Civil Engineering; •Sustainability Engineer; •Acoustic Engineering. •Fire Engineering |
7 | Professional Services The provision of Programme Management, Project Management, Design Management and Cost Management services for construction projects including a wide range of project types such as containment, non-containment, refurbishment, new buildings, infrastructure, and associated works. |
Award Detail
1 | Kier Construction (Manchester)
|
2 | Merit Holdings (Northumberland)
|
3 | Scitech Engineering (Surrey)
|
4 | Walter Lilly (Leeds)
|
5 | ISG Construction (London)
|
6 | John Sisk (Hertfordshire)
|
7 | Kier Construction (Manchester)
|
8 | Willmott Dixon Construction (Hertfordshire)
|
9 | GM Builders (Brighton)
|
10 | Kier Construction (Manchester)
|
11 | Morgan Sindall Construction & Infrastructure (London)
|
12 | Walter Lilly (Leeds)
|
13 | ISG Engineering Services (London)
|
14 | Kier Construction (Manchester)
|
15 | Morgan Sindall Construction & Engineering (London)
|
16 | Willmott Dixon Construction (Hertfordshire)
|
17 | GM Builders (Brighton)
|
18 | John Graham Construction (Hillsborough)
|
19 | Tilbury Douglas Construction (London)
|
20 | Walter Lilly (Leeds)
|
21 | ISG Engineering Services (London)
|
22 | John Sisk (Hertfordshire)
|
23 | Tilbury Douglas Construction (London)
|
24 | Willmott Dixon Construction (Hertfordshire)
|
25 | Chubb Systems (Lancashire)
|
26 | Galliford Try Construction (Middlesex)
|
27 | Openview Security Solutions (Romford)
|
28 | Baker Hicks (London)
|
29 | Ramboll (London)
|
30 | Tetra TECH (Leeds)
|
31 | WSP (London)
|
32 | AECOM (London)
|
33 | Norman Rourke Pryme (London)
|
34 | Rider Levett Bucknall (Birmingham)
|
35 | Turner & Townsend Cost Management (Leeds)
|
36 | Mace Consult (London)
|
37 | Norman Rourke Pryme (London)
|
38 | Tetra TECH (Leeds)
|
39 | Turner & Townsend Project Management (Leeds)
|
Award Criteria
price | _ |
CPV Codes
- 45000000 - Construction work
- 45200000 - Works for complete or part construction and civil engineering work
- 71320000 - Engineering design services
- 71541000 - Construction project management services
- 45213250 - Construction work for industrial buildings
- 45451000 - Decoration work
- 71242000 - Project and design preparation, estimation of costs
- 45214610 - Laboratory building construction work
- 35125300 - Security cameras
- 45222300 - Engineering work for security installations
- 50610000 - Repair and maintenance services of security equipment
- 92222000 - Closed circuit television services
- 71321000 - Engineering design services for mechanical and electrical installations for buildings
- 79930000 - Specialty design services
- 71311300 - Infrastructure works consultancy services
- 71312000 - Structural engineering consultancy services
- 71322100 - Quantity surveying services for civil engineering works
- 44163112 - Drainage system
- 45232452 - Drainage works
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-02f1ee
- FTS 027611-2022